1981 to 1990 - Various positions from Cadet Engineer, Civil Engineer, Estimator II, Planning & Cost Engineer, Opcen Head, Resident Engineer, Site Representative. Work assignment from based in Makati City, Philippines; Bauan, Batangas; Kingdom of Saudi Arabia; Libya; Singapore; Hong Kong and Malaysia.
1981 to 1990 - Various positions from Cadet Engineer, Civil Engineer, Estimator II, Planning & Cost Engineer, Opcen Head, Resident Engineer, Site Representative. Work assignment from based in Makati City, Philippines; Bauan, Batangas; Kingdom of Saudi Arabia; Libya; Singapore; Hong Kong and Malaysia.
1981 to 1990 - Various positions from Cadet Engineer, Civil Engineer, Estimator II, Planning & Cost Engineer, Opcen Head, Resident Engineer, Site Representative. Work assignment from based in Makati City, Philippines; Bauan, Batangas; Kingdom of Saudi Arabia; Libya; Singapore; Hong Kong and Malaysia.
1981 to 1990 - Various positions from Cadet Engineer, Civil Engineer, Estimator II, Planning & Cost Engineer, Opcen Head, Resident Engineer, Site Representative. Work assignment from based in Makati City, Philippines; Bauan, Batangas; Kingdom of Saudi Arabia; Libya; Singapore; Hong Kong and Malaysia.
1981 to 1990 - Various positions from Cadet Engineer, Civil Engineer, Estimator II, Planning & Cost Engineer, Opcen Head, Resident Engineer, Site Representative. Work assignment from based in Makati City, Philippines; Bauan, Batangas; Kingdom of Saudi Arabia; Libya; Singapore; Hong Kong and Malaysia.
I started my career at PCS Nitrogen where I was a Mechanical Technician tasked with the repair of Centrifugal pumps and Compressors, Steam Turbines.
I then moved to Atlantic LNG in its embryonic stages also as a Mechanical Technician where I worked on both GE Gas Turbines and Compressors and Solar Mars Turbines etc.
I was introduced to the Planning/ Project Control fields in 2001 as a Maintenance Planner responsible for planning daily maintenance activities, I then moved on to TAR Planning and Scheduling.
The Projects Execution Planner is responsible for ensuring that best practices are applied to produce optimized project plans and schedules for projects during the AVP Execution Stage, in particular fieldconstruction.