Engineering, Procurement and Construction Management of LRCCU plant modification and extension project, including:
-Piping Modification
-Heat exchanger, column, vessel, Tankage, reactor and regenerator , air fin cooler, separating equipment ,pump, compressor and blower equipment modification and new installation
-CO Boiler revamp and restoration included tube banks, Superheater, Ecomoniser, Soot blowers, Deslaggers, FD Blower, CO ducts) feed water drum, de-superheater, economizers)
1) Set up Work Break Down Structure for progress measurement and scheduling.
-Piping Modification
-Heat exchanger, column, vessel, Tankage, reactor and regenerator , air fin cooler, separating equipment ,pump, compressor and blower equipment modification and new installation
-CO Boiler revamp and restoration included tube banks, Superheater, Ecomoniser, Soot blowers, Deslaggers, FD Blower, CO ducts) feed water drum, de-superheater, economizers)
1) Set up Work Break Down Structure for progress measurement and scheduling.
Chiyoda Corporation Lead Planner
Directly reporting to Area Construction Manager. Perform tasks related to the collection and evaluation of data required to monitor construction schedules. Apply the principle and techniques of resource monitoring to specific tasks. Primary responsibilities are as follows:
• Develops, drafts and computerizes construction network schedule for assigned area of work coordinating with on-plot/off-plot area schedulers.
• Develops, drafts and computerizes construction network schedule for assigned area of work coordinating with on-plot/off-plot area schedulers.