Afcons Infrastructure Limited
Afcons Infrastructure Limited
Afcons Infrastructure Limited Assistant Planner
Asst. Planner; Moolchand Under-pass (New Delhi), Pune Fly Overs, PK Roads (Part of GQ Project; NHAI), TATA Coal Jetty (Mumbai), Nava-Sheva Pipe Line...
Afcons Infrastructure Limited Planning Manager
This company was involved in Construction of 7 Kms of Viaduct & Two Station Buildings for Delhi Mass Rail Transport System in New Delhi
Reporting to the Project Manager, I was responsible for the following
Prepare the monthly programme updates for the project
Tracking progress, man hours and cost as compared to original plan and co-ordinate the weekly, fortnightly and monthly reports to Engineer / Employer
Raise monthly payment request / invoices to the Engineer / Employer
Reporting to the Project Manager, I was responsible for the following
Prepare the monthly programme updates for the project
Tracking progress, man hours and cost as compared to original plan and co-ordinate the weekly, fortnightly and monthly reports to Engineer / Employer
Raise monthly payment request / invoices to the Engineer / Employer
Trainee Civil Engineer, Afcons Infrastructure Limited, Tata Coal Berth, Trombay, Mumbai
START Date
END Date
- Construction of Block Wall Jetty at Mumbai (Client: Tata Power Ltd, and Engineer: Tata Consulting Engineers) as a Trainee Engineer from September 2005 to July 2006:
- To assist the Project Planning Engineer to develop the necessary
Afcons Infrastructure Limited Project Controls Engineer
M/S AFCONS INFRASTRUCTURE LIMITED - ISO 9001-2000 (Nov 2002 to Jul 2004)
Project: Construction of LNG Receiving Terminal Jetty, Surat, India
Construction of Tug Mooring Facilities, Surat, India
Project Cost: Rs. 250 Million
Owner: THE ROYAL DUTCH PETROLEUM AND SHELL GROUP OF COMPANIES LTD.
Management Contractor: SAIPEM s. a. LTD
Details of Major Projects involved in:
Project: Construction of LNG Receiving Terminal Jetty, Surat, India
Construction of Tug Mooring Facilities, Surat, India
Project Cost: Rs. 250 Million
Owner: THE ROYAL DUTCH PETROLEUM AND SHELL GROUP OF COMPANIES LTD.
Management Contractor: SAIPEM s. a. LTD
Details of Major Projects involved in:
Afcons Infrastructure Limited Civil Engineer
Construction of High Block Building for ROP Project at B.A.R.C. & TARAPUR 3 & 4 Nuclear Power Plant,Tarapur, Mumbai
Client: Bhabha Atomic Research Centre/NPCIL
Consultant : M/s Stup Consultant Pvt. Ltd. Mumbai
Responsibilities:
Work execution in accordance with contract document, specifications, approved procedures & as per schedule.
Supervision, administration, inspection & expediting the task in assigned orders.
Preparation of material takeoff.
Client: Bhabha Atomic Research Centre/NPCIL
Consultant : M/s Stup Consultant Pvt. Ltd. Mumbai
Responsibilities:
Work execution in accordance with contract document, specifications, approved procedures & as per schedule.
Supervision, administration, inspection & expediting the task in assigned orders.
Preparation of material takeoff.
Afcons Infrastructure Limited Planner
- Preparation of Contract Appreciation Document
- Preparation of General and Detailed Method Statement
- Preparation of Construction Schedule Using Primavera
- Preparation of Accelerated Program & Catch up Plan
- Preparation of Extension of Time Program
- Preparation of Cash Flow Curves
- Preparation of Resource Allocation & Leveling
- Preparation of Planned Vs Actual Progress Program
- Preparation of Impact Program
- Progress Monitoring of the Project at Head Office Level
- Coordination with the Design Team
- Preparation of General and Detailed Method Statement
- Preparation of Construction Schedule Using Primavera
- Preparation of Accelerated Program & Catch up Plan
- Preparation of Extension of Time Program
- Preparation of Cash Flow Curves
- Preparation of Resource Allocation & Leveling
- Preparation of Planned Vs Actual Progress Program
- Preparation of Impact Program
- Progress Monitoring of the Project at Head Office Level
- Coordination with the Design Team
Afcons Infrastructure Limited Planner
Project: Kol dam Hydro Power Project (800MW)
Structure: Desilting arrangement (Excavation thruogh drilling & blasting, RCC raft, Piers, weirs, RCC deck)
Structure: Desilting arrangement (Excavation thruogh drilling & blasting, RCC raft, Piers, weirs, RCC deck)