Hatch Africa
Hatch Africa
Hatch Africa Planner
ACP Rustenburg - Acid Plant - GRP piping refurbishment
Hatch Africa Planner
Current Role
Hatch Africa Planner
Current Role
Hatch Africa Lead Planner
Sishen South Iron Ore Expansion Project (US $400 Million)
Responsible for the developing, monitoring and presenting of the following:
Major Milestone report for the project.
Level 1 Monthly report.
Level 2 Monthly reports.
Level 3 Master schedule for Engineering, Procurement, Manufacturing / Fabrication, Construction & Cold/Wet Commissioning.
Level 4 Engineering schedule (3D modelling).
Responsible for the developing, monitoring and presenting of the following:
Major Milestone report for the project.
Level 1 Monthly report.
Level 2 Monthly reports.
Level 3 Master schedule for Engineering, Procurement, Manufacturing / Fabrication, Construction & Cold/Wet Commissioning.
Level 4 Engineering schedule (3D modelling).
Hatch Africa Lead Planner
Tati Activox Nickel Project (US $2,1 Billion)
Hatch Africa Planner
I am part on the managment JV-team on the rail expansion project for transnet (client). I am responsible for measuring progress against baseline schedules submitted by the principal & sub-contractors, acceptence or rejection of the schedules submitted. Reports, S-curves and grafical presentations of progress and costs.
Hatch Africa Project Controls Engineer
Cost estimating- Estimate At Completion
Set up of Project Work Breakdown Structures
EPCM hours forecasting and updates
Generate and update budgets
Forecasting project cash flows
Develop and analyze trends and statistics
Change Management (NEC3 Compensation Events)
Prepare monthly cost report
Providing cash flow estimates for Client’s Capex budgets
Preparing estimates for Transnet Capex Committee
Escalation Calculation
Tracking Forex exposure
Ad-hoc reporting to the client
Set up of Project Work Breakdown Structures
EPCM hours forecasting and updates
Generate and update budgets
Forecasting project cash flows
Develop and analyze trends and statistics
Change Management (NEC3 Compensation Events)
Prepare monthly cost report
Providing cash flow estimates for Client’s Capex budgets
Preparing estimates for Transnet Capex Committee
Escalation Calculation
Tracking Forex exposure
Ad-hoc reporting to the client