TECHNIP
TECHNIP
Lead Planning Engineer, Technip, OFON Phase 2 T&I Project
START Date
Lead Planning Engineer OFON Phase 2 Transport & Installation Project.
Planning & Scheduling Engineer, TECHNIP, Planning & Scheduling Statistics and Modelization
START Date
END Date
Development of a new set of Progress Curves and Key Points model for Onshore & Offshore Projects
TECHNIP Planner
Current Role
TECHNIP Planning Engineer
Planning Engineer – Apache Replacement Project
• I joined the Apache Replacement Project at the start of November 2008. The project brief is to de-commission the original Apache Pipe Lay Vessel and install all Pipe Lay equipment on to a new hull currently known as the North Ocean 103 (Apache II).
• Main responsibilities
• Master Control Schedule.
• Tracking & Baseline Schedule.
• I joined the Apache Replacement Project at the start of November 2008. The project brief is to de-commission the original Apache Pipe Lay Vessel and install all Pipe Lay equipment on to a new hull currently known as the North Ocean 103 (Apache II).
• Main responsibilities
• Master Control Schedule.
• Tracking & Baseline Schedule.
TECHNIP Planner
Current Role
TECHNIP Senior Planner
Technip France - Planning Manager on Woodside Browse LNG Project
TECHNIP Lead Planner
Lead Planning Engineer - Technip & Subea 7 - Montara subsea field development and Laminaria riser replacement
TECHNIP Project Controls Engineer
Various project costs controlled from refinery to fertilizers to gas desulfurization...