histogram for actual and planned manpower in P3

Member for

17 years 4 months

I did not get the answer from any one

but

i thought of one answer



Primavera can give values of current project planned progress and other on target one ,if we make target plan in such a way that the oll ather things remain same expect planned resources than we can enter actual value in the target plan ,

Be carful in updating the target and donot update resources , this method can give

planned histogram

actual target histogram



Hope you have pick it



Regards



Umer

Member for

17 years 4 months

Thank for Reply



Actually i want the report on primavera outlook format,i can generate report in excel but it looks fabricated ,Primavera reports give look a system generated report and people believe that it has not been fabricated (although it can be fabricated even in oulook form)



thanks for replying

Member for

17 years 2 months

Dear Umer,



You can get the planned manpower from resource loading. The actual manpower can be tracked daily based on site reports.