I think its just a case of getting all the report options to match. For example, make sure you are excluding actual from both reports, selecting exactly the same resources and activities.
Also, there is a tick box on the cost loading report timescale tab to Only include values within date range. Try switching this on and off - I never have worked out how it works!
Also make sure the decimal places match, otherwise one figure will be rounded.