When you say that you were unable to alter the civil activities, I now assume that you mean to alter the activity durations and not some other activity feature. They may be resource-controlled durations defined by daily use and limit. Is this the case?
Member for
19 years 4 months
Member for19 years4 months
Submitted by Vijayasarthty S on Sat, 2007-07-21 05:29
I am sorry about the insufficeint information part.
The program i am working on is single no sub projects involved. I just set about slotting the MEP activties in between the already exinting civil ones. Hope this info helps you.
Thanks for ur wishes..... I will try the same and get back to you.
Member for
22 years 10 months
Member for22 years10 months
Submitted by Ronald Winter on Thu, 2007-07-19 22:28
When you need help, you really should try to tell us everything about your setup. I am assuming that you are running the Master Schedule and that the Civil portion of your schedule is contained in a subproject. The problem is probably that they did not strip out the ownership protections of the schedule before exporting it to you. You are being allowed read privilege but not write privilege.
Run C:\P3Win\P3PROGS\P3NET.EXE (password=netset) and change the User Privileges to allow you access to the schedule. Good luck!
Member for
22 years 10 monthsRE: Protect Activities In Primavera
When you say that you were unable to alter the civil activities, I now assume that you mean to alter the activity durations and not some other activity feature. They may be resource-controlled durations defined by daily use and limit. Is this the case?
Member for
19 years 4 monthsRE: Protect Activities In Primavera
I am sorry about the insufficeint information part.
The program i am working on is single no sub projects involved. I just set about slotting the MEP activties in between the already exinting civil ones. Hope this info helps you.
Thanks for ur wishes..... I will try the same and get back to you.
Member for
22 years 10 monthsRE: Protect Activities In Primavera
When you need help, you really should try to tell us everything about your setup. I am assuming that you are running the Master Schedule and that the Civil portion of your schedule is contained in a subproject. The problem is probably that they did not strip out the ownership protections of the schedule before exporting it to you. You are being allowed read privilege but not write privilege.
Run C:\P3Win\P3PROGS\P3NET.EXE (password=netset) and change the User Privileges to allow you access to the schedule. Good luck!