Primavera Project Planner - P3 Member for 20 years 8 months Member for 20 years 8 months Submitted by Bijaya Bajracharya on Thu, 2007-05-17 11:49 Permalink RE: Dates Run date = the date on which the project was last run (opened). Any change made in activity (for example progressing, changing original or remaining durations)will have effect only in that activity until F9 is pressed (rescheduled). Log in or register to post comments
Member for 20 years 8 months Member for 20 years 8 months Submitted by Bijaya Bajracharya on Thu, 2007-05-17 11:49 Permalink RE: Dates Run date = the date on which the project was last run (opened). Any change made in activity (for example progressing, changing original or remaining durations)will have effect only in that activity until F9 is pressed (rescheduled).
Member for
20 years 8 monthsRE: Dates
Run date = the date on which the project was last run (opened). Any change made in activity (for example progressing, changing original or remaining durations)will have effect only in that activity until F9 is pressed (rescheduled).