After scheduling i think you got a report of the loops detected...Actually loops are traced when activities are linked incorrect..i.e example of a loop is A-B-C-D-A..just go to the activity A and check its predecessor or successor and make correction..ur schedule shall be successful.
Member for
19 years 3 monthsRE: Sheduling - Loop
Dear Honnes,
its worked well...
thx
Member for
20 years 3 monthsRE: Sheduling - Loop
Hello Jaya
Dont use F9 for scheduling, use the Icon with the red clock.
This will give you the report
Hannes
Member for
19 years 3 monthsRE: Sheduling - Loop
Dear Ramana,
thanks for ur immediate response...
but when am scheduling it, am not getting detailed report, just its showing scheduling terminated and loops detected...
I don kno, whther any installation file wud be missing????
Member for
18 years 9 monthsRE: Sheduling - Loop
Heyy...
After scheduling i think you got a report of the loops detected...Actually loops are traced when activities are linked incorrect..i.e example of a loop is A-B-C-D-A..just go to the activity A and check its predecessor or successor and make correction..ur schedule shall be successful.
Regards,
VENKAT RAMANA