Primavera Project Planner - P3 Member for 20 years 5 months Member for 20 years 5 months Submitted by Jose Frade on Thu, 2006-09-07 03:14 Permalink RE: Graphic reports in P3 Hello Alexandre, You can edit the mentioned box, change it the way you like it but you cannot save them in P3 for future graphic reports (as far as I know). However, you can manually copy them from previous saved reports and paste in new ones. For editing in Primavera Look simply select Tools / Selection and select element(s) youy want to edit/delete. Hope it helps. Br JMFrade Log in or register to post comments
Member for 20 years 5 months Member for 20 years 5 months Submitted by Jose Frade on Thu, 2006-09-07 03:14 Permalink RE: Graphic reports in P3 Hello Alexandre, You can edit the mentioned box, change it the way you like it but you cannot save them in P3 for future graphic reports (as far as I know). However, you can manually copy them from previous saved reports and paste in new ones. For editing in Primavera Look simply select Tools / Selection and select element(s) youy want to edit/delete. Hope it helps. Br JMFrade
Member for
20 years 5 monthsRE: Graphic reports in P3
Hello Alexandre,
You can edit the mentioned box, change it the way you like it but you cannot save them in P3 for future graphic reports (as far as I know).
However, you can manually copy them from previous saved reports and paste in new ones.
For editing in Primavera Look simply select Tools / Selection and select element(s) youy want to edit/delete.
Hope it helps.
Br
JMFrade