Primavera Project Planner - P3 Member for 19 years 3 months Member for 19 years 3 months Submitted by Morph T on Sun, 2006-08-13 13:51 Permalink RE: Assign production value to activities Hello It’s rather strange to post a question then give the answer I did not get the whole picture of schedule and cost control, it has nothing to do with P3, it’s about understanding the process of project control. Thanks for that guy who give for free such a valuable book about PM Here is the link http://www.ce.cmu.edu/pmbook/12_Cost_Control,_Monitoring,_and_Accountin… If you are a newbie like me, it will help you a lot. Log in or register to post comments
Member for 19 years 3 months Member for 19 years 3 months Submitted by Morph T on Sun, 2006-08-13 13:51 Permalink RE: Assign production value to activities Hello It’s rather strange to post a question then give the answer I did not get the whole picture of schedule and cost control, it has nothing to do with P3, it’s about understanding the process of project control. Thanks for that guy who give for free such a valuable book about PM Here is the link http://www.ce.cmu.edu/pmbook/12_Cost_Control,_Monitoring,_and_Accountin… If you are a newbie like me, it will help you a lot.
Member for
19 years 3 monthsRE: Assign production value to activities
Hello
It’s rather strange to post a question then give the answer
I did not get the whole picture of schedule and cost control, it has nothing to do with P3, it’s about understanding the process of project control.
Thanks for that guy who give for free such a valuable book about PM
Here is the link http://www.ce.cmu.edu/pmbook/12_Cost_Control,_Monitoring,_and_Accountin…
If you are a newbie like me, it will help you a lot.