Primavera Project Planner - P3 Member for 22 years 3 months Member for 22 years 4 months Submitted by Luca Basile on Fri, 2004-02-27 02:22 Permalink RE: P3 Interface with InControl I do not know what You can do with InControl, but in the case You are able to put with coding (that will reflect the P3 ID), using RA engine You can update automatically Your P3 schedule. Log in or register to post comments
Member for 22 years 3 months Member for 22 years 4 months Submitted by Luca Basile on Fri, 2004-02-27 02:22 Permalink RE: P3 Interface with InControl I do not know what You can do with InControl, but in the case You are able to put with coding (that will reflect the P3 ID), using RA engine You can update automatically Your P3 schedule.
Member for
22 years 3 monthsRE: P3 Interface with InControl
I do not know what You can do with InControl, but in the case You are able to put with coding (that will reflect the P3 ID), using RA engine You can update automatically Your P3 schedule.