That is correct Ugo because it calculates on a forwart pass and also on a backward pass. So the late schedule indeed shows a as late as possible schedule.
Member for
22 years
Member for22 years
Submitted by Ugo Marsolais on Wed, 2003-10-15 11:10
Thanks Alphons for the answer. I did not thought about that since I believed this was only a display trick...
But by trying it I have realized that since P3 is calculating a late start and finish date, this basically means P3 is scheduling ASAP and ALAP simultaneously, is that right?
Member for
23 years 9 months
Member for23 years9 months
Submitted by Alphons Bruns on Wed, 2003-10-15 03:52
Member for
23 years 9 monthsRE: As Late As Possible Scheduling
That is correct Ugo because it calculates on a forwart pass and also on a backward pass. So the late schedule indeed shows a as late as possible schedule.
Member for
22 yearsRE: As Late As Possible Scheduling
Thanks Alphons for the answer. I did not thought about that since I believed this was only a display trick...
But by trying it I have realized that since P3 is calculating a late start and finish date, this basically means P3 is scheduling ASAP and ALAP simultaneously, is that right?
Member for
23 years 9 monthsRE: As Late As Possible Scheduling
Hello Ugo,
In Bars you can select the late bar to show instead of the early bar. just go to bars and select the late bar to make it visible.
Regards Alphons