John, start pressing the TAB key (or SHIFT+TAB to go backwards) instead of enter - no noise!
Also when you're in a cell in the bottom, for exmaple the duration cell, pressing PG Up and PG Down takes you to the next/previous activity but staying in the same cell.
Member for
21 years 8 months
Member for21 years8 months
Submitted by Rafael Davila on Tue, 2022-07-19 22:39
It's not P6. It's application sound. If you wanted to turn off the application annoying sound:
1 click Start (Window Logo)
2 select Settings then click System
3 on the left side of the screen click Sound
4 scroll down until you see Advance sound options
5 click App volume and device preferences
6 under the App System Sound you can either slide the volume to 0 or click the speaker icon to have it mute
Try to do something in P6 if the annoying sound still exist. If not you can close the settings window. You can play music and you can still hear the music play. Sometime if you play some sound it automatically remove the system mute but you can always put it in the app system mute and still hear other sounds but not the app annoying sound.
Member for
20 years 6 monthsJohn, start pressing the TAB
John, start pressing the TAB key (or SHIFT+TAB to go backwards) instead of enter - no noise!
Also when you're in a cell in the bottom, for exmaple the duration cell, pressing PG Up and PG Down takes you to the next/previous activity but staying in the same cell.
Member for
21 years 8 monthsThat every time you hit the
Good Luck
Member for
19 yearsIt's not P6. It's application
It's not P6. It's application sound. If you wanted to turn off the application annoying sound:
1 click Start (Window Logo)
2 select Settings then click System
3 on the left side of the screen click Sound
4 scroll down until you see Advance sound options
5 click App volume and device preferences
6 under the App System Sound you can either slide the volume to 0 or click the speaker icon to have it mute
Try to do something in P6 if the annoying sound still exist. If not you can close the settings window. You can play music and you can still hear the music play. Sometime if you play some sound it automatically remove the system mute but you can always put it in the app system mute and still hear other sounds but not the app annoying sound.