Railway Construction Member for 14 years 11 months Member for 14 years 11 months Submitted by safinaz on Wed, 2011-06-22 11:44 Permalink Dear Mr. W.Yousman,With Dear Mr. W.Yousman, With reference to your post that you were asking about the better method of civil work construction phase in underground railway project. Your choice should be follow the next factors. 1-Soil mechanics investigation reports; which method is reliable for land soil specifications. 2-Tunniling method is higher cost than cut and cover method. (If i have more time i'll provide you with detailed information and referenced data ASAP) WBR Safinaz Log in or register to post comments
Member for 14 years 11 months Member for 14 years 11 months Submitted by safinaz on Wed, 2011-06-22 11:44 Permalink Dear Mr. W.Yousman,With Dear Mr. W.Yousman, With reference to your post that you were asking about the better method of civil work construction phase in underground railway project. Your choice should be follow the next factors. 1-Soil mechanics investigation reports; which method is reliable for land soil specifications. 2-Tunniling method is higher cost than cut and cover method. (If i have more time i'll provide you with detailed information and referenced data ASAP) WBR Safinaz
Member for
14 years 11 monthsDear Mr. W.Yousman,With
Dear Mr. W.Yousman,
With reference to your post that you were asking about the better method of civil work construction phase in underground railway project.
Your choice should be follow the next factors.
1-Soil mechanics investigation reports; which method is reliable for land soil specifications.
2-Tunniling method is higher cost than cut and cover method.
(If i have more time i'll provide you with detailed information and referenced data ASAP)
WBR
Safinaz