Laing ORourke Ireland, Planner on Pier D, Dublin Airport. This was a €120m two storey 14,000m² pier building with arrivals (ground floor) and departures (first floor). The building construction was steel frame, concrete floors, metal deck roof, metal cladding to the ground floor level, with full glazing at first floor level. The building is fully serviced and the project included a full electrical, mechanical & IT systems fit out. The building also included a single storey elevated walkway, the central portion of which is a cable stayed bridge.