Post Graduate Student, "University of dundee, student", Thesis - Managing Unexpected Construction Projects START Date Sun, 08/01/2010 - 02:00 END Date Sat, 06/01/2013 - 02:00 Experience Hours (Planning & Scheduling) 1000 Read more about Post Graduate Student, "University of dundee, student", Thesis - Managing Unexpected Construction Projects
Civil Engineer, Metro Tunneling Group Dywidag-L&T-Samsung-Ircon-Shimizu JV, Delhi Metro - Construction of Metro twin tunnel and two underground metro stations. The tunnel by Shield TBM and the stations by using the Top Down with D-wall START Date Sun, 07/01/2007 - 02:00 END Date Tue, 07/01/2008 - 02:00 Experience Hours (Planning & Scheduling) 2000 Read more about Civil Engineer, Metro Tunneling Group Dywidag-L&T-Samsung-Ircon-Shimizu JV, Delhi Metro - Construction of Metro twin tunnel and two underground metro stations. The tunnel by Shield TBM and the stations by using the Top Down with D-wall