Sellafields Sites Ltd Project Controls Engineer

B30 Legacy Pond is an ailing building from the 1960s that is at various stages of decommissioning. Known as the most polluted industrial building in Europe, it represents one of the world’s toughest radiological decommissioning operation engaging all levels of stakeholders. Value is in excess of £70m over the whole life-cycle. Scope includes; O&M, EPC, construction, HVAC, all levels of waste disposal routes within stringent safety practices.

Boulting Group Planner

Planning and progress reporting on site based projects and maintenance planning.
Including break down of hours from target costs and estimates for integration into the overall programme, site measures, collation of progress information from external contractors, reports, S-Curves and programme updates to reflect progress.
Also the implication of global planning chart

Capital Resourcing Planner

04/2009 - PRESENT - SELLAFIELD, WINDSCALE SITE
PROJECT PLANNING ENGINEER – B13 COMMERCIAL OPERATIONS

•     I am responsible for the production and maintenance of P3e and MSP Schedules associated with the Commercial Operations within B13 and the production and Implementation of the Leased Operations Facility Integrated Safety Improvement Programme (ISIP)
•     I am responsible for the production of P3e programmes to meet NDA ‘Life Time Plan’ requirements associated with B13 Leased Operations Facility.

BAE Systems Marine Senior Planner

06/2002 – 06/2008 - BAE SYSTEMS, BARROW-IN-FURNESS
SENIOR PLANNING ENGINEER – ASTUTE CLASS SUBMARINE PROGRAMME

•     Scope Activities from plan utilising drawings and model info and link to level 3 activity in Marine Life Cycle Catalogue.
•     Being actively involved in IWT or other meetings required to attend. Taking minutes and co-ordinating actions where required.
•     Updating of required fields in detailed planning systems.