Experienced Planner/Senior Planning Engineer – Top 10 contractor – South East – Primavera P6 /Civils/Water
Water Planners (Civils/Utilities), Contract and Permanent, Planner and Senior, Wales and Yorkshire.
Planner and Senior Planner, CONDOR BUILDING CONTRACTING LLC, Buildings,Tunnels
A total of 9 years & 7 Months of experience in various fields of Construction.
1. Company - M/s Condor Building Contracting LLC Dubai, UAE.
Duration : January 2007 to till date.
Planner and Senior Planner, 1eEurope LImited, Luas Redline Extension
Current RoleI am a self-driven senior planner with over twenty years’ experience in construction on many types such as, high rise buildings ranging in height from three to forty five floors, I also have experience with airport, MOD and over ground railway projects ranging in value from 12m to 60m.
I come from a multi skilled background where my career progressed through to construction management and then onto project planning.
Planner and Senior Planner, KCA-Deutag, Clair Ridge
RDS/KCA-Deutag
RDS, KCA DEUTAG’s engineering division, has been a leader in the design of drilling facilities for offshore platforms provides engineering services from pre-project and Front End Engineering Design (FEED) through detail design, construction support, hook-up and commissioning
Senior Planning Engineer
Planner and Senior Planner, No Company, Design and Build Cernavida to Medgidia Motorway
Current Role
Planning Engineer for the Independent Engineer for the "Elefsina, Korinthos, Patra, Pyrgos, Tsakona motorway" project. Project Time Schedule review and follow up, monthly reports and constructor's payment applications review.
Planner and Senior Planner, Tipakorn, Connecting Bangkok Southern Ring Road and Industry Ring Road
Created Baseline for Master Schedule and Narrative Schedule.
Writing Monthly Report and Monitoring Schedule.
Cost Estimate for Evaluated Sub Contractor and NewItem on Site.
Planner and Senior Planner, BECHTEL, Crossrail
Current Role
Fully resource the construction programme with all labour, plant and materials. Critical path analysis and produce mitigation programmes where required to accommodate lost time or change of scope of works. Implementation of compensation events and the effects on the accepted programme and the future costs. Using P6, produce cost curves and future trends of spend. Compile progress reports each month for the client and key milestone reports. Proficient in the use of P3, P6, CS Project as well as other software