Engineering, procurement, fabrication, installation and tie-in of :
• 2 off PLEMs, including permanent Protection
• 4 rigid spools, including permanent Protection
• TL Tee permanent Protection
• SIPS Hot tap permanent Protection
• Tie-in components for assembly onto the TL pipeline and pipeline heads
• TL 10” riser and laydown head
• TL Tee and onto the two hot tap spools
Engineering, procurement, fabrication, installation of a new approximately 16 km long 12,6” production flow line
• 1 off sub sea templates with integrated protection structures
• 1 off manifold
• 16 km long (320mm" ID) insulated production pipeline with DEH piggyback cable including MPS protection of DEH and a mid-line T for future connections.
• 1 off Integrated Service Umbilical
• 1 rigid spool at template end
• Protection structure on flow line T
• 1 off flexible risers for production.
• Approx. 3 km armoured feeder cable for DEH
Engineering, procurement, fabrication, installation of a new approximately 20.1 km long 10.5” ID production flow line
• 2 off sub sea templates with integrated protection structures
• 2 off manifold
• 20.1 km long (10.5" ID) thermally insulated production pipeline
(U = 5 W/m²K) in 13Cr-steel with DEH piggyback cable and a mid-line T for connection to Template South
• 1 off Integrated Service Umbilical
• 1 rigid spool at both templates
• Protection structure on flow line T South
• 1 off DEH riser
• 1 off flexible risers for production.
• 1 off coaxial armoured feeder cable for DEH. SSIV with gas lift and hydraulic lines
Engineering, procurement, fabrication, installation of:
• Fabrication of Structures (7 off):
• Gas export riser base, gas export PLEM FLAGS, gas export future tie-in valve structure, oil export riser base, gas infield riser base, oil infield riser base
• Installation of Structures (8 off):
• Gas export riser base, gas export PLEM FLAGS, gas export future tie-in valve structure, oil export riser base, gas infield riser base, oil infield riser base, Vega riser base and SSIV/ Gas Lift Riser Base.
• Fabrication of infield flowline spools (17 off) and spool protection covers.
• Installation of infield flowline spools (17 off), umbilical spools (2 off) and spool protection covers towards templates.
• Tie-ins using ROVCON Mk II:
Pipeline tie-ins (39 off)
Umbilical tie-ins (9 off )
• Tie-in of risers to riser bases (7 off)
• Fabrication and installation of oil export pipeline spool and spool protection cover (at TOR II / KOR wye), and BBRTS tie-ins (2 off).
• Fabrication and installation of gas export pipeline spools (2 off at Gjøa and 2 off at FLAGS) and Protection Covers, and tie-ins using PSS (4 off).
• 2 off PLEMs, including permanent Protection
• 4 rigid spools, including permanent Protection
• TL Tee permanent Protection
• SIPS Hot tap permanent Protection
• Tie-in components for assembly onto the TL pipeline and pipeline heads
• TL 10” riser and laydown head
• TL Tee and onto the two hot tap spools
Engineering, procurement, fabrication, installation of a new approximately 16 km long 12,6” production flow line
• 1 off sub sea templates with integrated protection structures
• 1 off manifold
• 16 km long (320mm" ID) insulated production pipeline with DEH piggyback cable including MPS protection of DEH and a mid-line T for future connections.
• 1 off Integrated Service Umbilical
• 1 rigid spool at template end
• Protection structure on flow line T
• 1 off flexible risers for production.
• Approx. 3 km armoured feeder cable for DEH
Engineering, procurement, fabrication, installation of a new approximately 20.1 km long 10.5” ID production flow line
• 2 off sub sea templates with integrated protection structures
• 2 off manifold
• 20.1 km long (10.5" ID) thermally insulated production pipeline
(U = 5 W/m²K) in 13Cr-steel with DEH piggyback cable and a mid-line T for connection to Template South
• 1 off Integrated Service Umbilical
• 1 rigid spool at both templates
• Protection structure on flow line T South
• 1 off DEH riser
• 1 off flexible risers for production.
• 1 off coaxial armoured feeder cable for DEH. SSIV with gas lift and hydraulic lines
Engineering, procurement, fabrication, installation of:
• Fabrication of Structures (7 off):
• Gas export riser base, gas export PLEM FLAGS, gas export future tie-in valve structure, oil export riser base, gas infield riser base, oil infield riser base
• Installation of Structures (8 off):
• Gas export riser base, gas export PLEM FLAGS, gas export future tie-in valve structure, oil export riser base, gas infield riser base, oil infield riser base, Vega riser base and SSIV/ Gas Lift Riser Base.
• Fabrication of infield flowline spools (17 off) and spool protection covers.
• Installation of infield flowline spools (17 off), umbilical spools (2 off) and spool protection covers towards templates.
• Tie-ins using ROVCON Mk II:
Pipeline tie-ins (39 off)
Umbilical tie-ins (9 off )
• Tie-in of risers to riser bases (7 off)
• Fabrication and installation of oil export pipeline spool and spool protection cover (at TOR II / KOR wye), and BBRTS tie-ins (2 off).
• Fabrication and installation of gas export pipeline spools (2 off at Gjøa and 2 off at FLAGS) and Protection Covers, and tie-ins using PSS (4 off).