Engineering, procurement, fabrication, installation and tie-in of :



•     2 off PLEMs, including permanent Protection

•     4 rigid spools, including permanent Protection

•     TL Tee permanent Protection

•     SIPS Hot tap permanent Protection

•     Tie-in components for assembly onto the TL pipeline and pipeline heads

•     TL 10” riser and laydown head

•     TL Tee and onto the two hot tap spools



Engineering, procurement, fabrication, installation of a new approximately 16 km long 12,6” production flow line

•     1 off sub sea templates with integrated protection structures

•     1 off manifold

•     16 km long (320mm" ID) insulated production pipeline with DEH piggyback cable including MPS protection of DEH and a mid-line T for future connections.

•     1 off Integrated Service Umbilical

•     1 rigid spool at template end

•     Protection structure on flow line T

•     1 off flexible risers for production.

•     Approx. 3 km armoured feeder cable for DEH



Engineering, procurement, fabrication, installation of a new approximately 20.1 km long 10.5” ID production flow line

•     2 off sub sea templates with integrated protection structures

•     2 off manifold

•     20.1 km long (10.5" ID) thermally insulated production pipeline

(U = 5 W/m²K) in 13Cr-steel with DEH piggyback cable and a mid-line T for connection to Template South

•     1 off Integrated Service Umbilical

•     1 rigid spool at both templates

•     Protection structure on flow line T South

•     1 off DEH riser

•     1 off flexible risers for production.

•     1 off coaxial armoured feeder cable for DEH. SSIV with gas lift and hydraulic lines





Engineering, procurement, fabrication, installation of:



•     Fabrication of Structures (7 off):

•     Gas export riser base, gas export PLEM FLAGS, gas export future tie-in valve structure, oil export riser base, gas infield riser base, oil infield riser base

•     Installation of Structures (8 off):

•     Gas export riser base, gas export PLEM FLAGS, gas export future tie-in valve structure, oil export riser base, gas infield riser base, oil infield riser base, Vega riser base and SSIV/ Gas Lift Riser Base.

•     Fabrication of infield flowline spools (17 off) and spool protection covers.

•     Installation of infield flowline spools (17 off), umbilical spools (2 off) and spool protection covers towards templates.

•     Tie-ins using ROVCON Mk II:

Pipeline tie-ins (39 off)

Umbilical tie-ins (9 off )

•     Tie-in of risers to riser bases (7 off)

•     Fabrication and installation of oil export pipeline spool and spool protection cover (at TOR II / KOR wye), and BBRTS tie-ins (2 off).

•     Fabrication and installation of gas export pipeline spools (2 off at Gjøa and 2 off at FLAGS) and Protection Covers, and tie-ins using PSS (4 off).