Technip Norge A.S Senior Planner

Engineering, procurement, fabrication, installation and tie-in of :

•     2 off PLEMs, including permanent Protection
•     4 rigid spools, including permanent Protection
•     TL Tee permanent Protection
•     SIPS Hot tap permanent Protection
•     Tie-in components for assembly onto the TL pipeline and pipeline heads
•     TL 10” riser and laydown head
•     TL Tee and onto the two hot tap spools

Engineering, procurement, fabrication, installation of a new approximately 16 km long 12,6” production flow line
•     1 off sub sea templates with integrated protection structures
•     1 off manifold
•     16 km long (320mm" ID) insulated production pipeline with DEH piggyback cable including MPS protection of DEH and a mid-line T for future connections.
•     1 off Integrated Service Umbilical
•     1 rigid spool at template end
•     Protection structure on flow line T
•     1 off flexible risers for production.
•     Approx. 3 km armoured feeder cable for DEH

Engineering, procurement, fabrication, installation of a new approximately 20.1 km long 10.5” ID production flow line
•     2 off sub sea templates with integrated protection structures
•     2 off manifold
•     20.1 km long (10.5" ID) thermally insulated production pipeline
(U = 5 W/m²K) in 13Cr-steel with DEH piggyback cable and a mid-line T for connection to Template South
•     1 off Integrated Service Umbilical
•     1 rigid spool at both templates
•     Protection structure on flow line T South
•     1 off DEH riser
•     1 off flexible risers for production.
•     1 off coaxial armoured feeder cable for DEH. SSIV with gas lift and hydraulic lines


Engineering, procurement, fabrication, installation of:

•     Fabrication of Structures (7 off):
•     Gas export riser base, gas export PLEM FLAGS, gas export future tie-in valve structure, oil export riser base, gas infield riser base, oil infield riser base
•     Installation of Structures (8 off):
•     Gas export riser base, gas export PLEM FLAGS, gas export future tie-in valve structure, oil export riser base, gas infield riser base, oil infield riser base, Vega riser base and SSIV/ Gas Lift Riser Base.
•     Fabrication of infield flowline spools (17 off) and spool protection covers.
•     Installation of infield flowline spools (17 off), umbilical spools (2 off) and spool protection covers towards templates.
•     Tie-ins using ROVCON Mk II:
Pipeline tie-ins (39 off)
Umbilical tie-ins (9 off )
•     Tie-in of risers to riser bases (7 off)
•     Fabrication and installation of oil export pipeline spool and spool protection cover (at TOR II / KOR wye), and BBRTS tie-ins (2 off).