Monitoring
PLANNING ENGINEER, El Seif Engineering Contracting Co. - Riyadh, Housing Residential Complexes (MOI). $1.4 Bln, in K.S.A
Planning, Scheduling, Progress Tracking Updating, Monitoring, Controlling , Reporting & TIA (Time Impact Analysis)
Senior Planner, Gannon Dunkerely and Co.Ltd, Construction of Polypropylene Unit in Oil Refinery and Petrochemical ltd.
Current Role: Senior Planner
Responsibilities included but not limited to:
1. Preparing, Updating, Monitoring and Revising Baseline Master and Target Program on Primavera 6 (Macro and Micro level) with complete Cost and Resource Loading.
2. Prepare Procurment Schedule and organize the delivery of materials on site accordings.
3. Prepare Shop drawings and Material Submittal Schedules.
4. Prepare Cash Flow Plan and S-Curve , Current Versus Planned Projections.
Planning Engineer, Vinci Construction UK Limited, London Underground Various
Tender planner for successful Tottenham Court Road Station Upgrade, Baker Street S8 Enabling, Warren Street CMS bids, tender planner for LU SSR Power Upgrade Bid.
Engineer-In-Charge, A De Vera Corporation (Philippines), AC Steel Mill Plant and Pre-Cast Girder Steel Mould for Skyway
Responsibilities:
- Prepared project budget, cash flow, schedules and reports.
- Supervised work implementation and quality for billing evaluation.
- Prepared correspondence and attend coordination meeting.
- Supervised project and warehouse documentation.
Project Involved:
- Pre-Cast Girder Steel Mould for Skyway Project (Philippines)
- A C Steel Mill Plant Project (Philippines)
Junior Engineer - Planning (Scheduler), BF Corporation, Commercial Building
Responsibilities:
- Prepared Baseline Schedule, Histogram and S-Curves.
- Prepared Progress Reports and Cost Reports.
- Evaluated sub-contractors’ and suppliers’ billings.
- Prepare correspondence and construction methodology.
Project Involved:
- SM Southmall (Philippines)
Junior Cost and Planning (Scheduler) Engineer, Trans-Asia, Incorporated (Philippines), Raffles Corporate Center
Responsibilities:
- Reviewed project documents such as Contract of Agreement, drawings, specification and all documents related to project implementation and cost.
- Responsible for extra work quantity take off and change order.
- Prepared project budget, schedules and reports.
- Supervised work implementation and quality for billing evaluation.
- Prepared correspondence and attend coordination meeting.
- Occupational Safety and Health Officer.
Project Involved:
Cost Engineer, L&M Maxco Company, Incoporated (Philippines), FEU Engineering Building Renovation, NBS Commercial Center Phase 1, Shangri-La Plaza Renovation, NBS Commercial Center Phase 2
Responsibilities:
Senior Cost Engineer, Jafrika Trading and Services (Philippines), Residential Building, Condo Renovation, Insdustrial Facility, Substation, Hotel Renovation
Responsibilities:
- Managed project attend coordination meetings and prepare project schedule.
- Prepare project proposal, estimates and design.
- Prepared progress billing, company respondence and evaluate sub-contractor’s progress billing.
Project Involved:
Planning (Scheduler) Engineer, Marubeni Corporation (Qatar), GTC/124/2006/C Phase 7, GTC/117/006 220kV & 66kV, GTC/14/2003 Phase 5
Responsibilities:
Pagination
- Previous page
- Page 9
- Next page