As-built progress reporting

Principal Planning Engineer, 1) Carillion plc, Kirkintilloch Link Road

START Date
END Date

I was the site Planning Engineer for the Kirkintilloch Link Road, a 4.6Km road valued at £35M reporting directly to the Contracts manager and Commerclai Manager.  I developed a fully logic linked cost and resource loaded programme as required by the NEC Contract Conditions for the works which was used both by Carillion and our various client groups for cost and value monitoring and forecasting and has become essential for Cost Index analysis.  The programme is also used to demonstrate the effect of compensation events and project manager’s instructions.  

Planning Engineer, Kuwait Oil Company, 1] KOC Integrated Security System, 2] Construction of New Booster Station BS-160 at S&EK Facilities,3]40" GAS PIPELINE FROM BS-131 TO LPG PLANT IN MAA, 4]Crude Export Facilities at NTF, STF and MAA,5] Building New Ga

START Date

A highly experienced Project Controls professional with comprehensive skills in project planning, scheduling, cost control, monitoring and reporting, including strategic and operational planning, performance management, and project management in the oil and gas industry.