Estimator / Quantity Surveyor, SOUTH WEST ARCHITECTURE, Six Star Hotel- 2B + G + PODIUM + 25 HOTEL BUILDING WEST BAY LAGOON (Falcon Tower) Project Handled Doha Qatar. START Date Mon, 03/01/2010 - 01:00 Read more about Estimator / Quantity Surveyor, SOUTH WEST ARCHITECTURE, Six Star Hotel- 2B + G + PODIUM + 25 HOTEL BUILDING WEST BAY LAGOON (Falcon Tower) Project Handled Doha Qatar.
Estimator / Quantity Surveyor, SOUTH WEST ARCHITECTURE, Six Star Hotel- 2B + G + PODIUM + 25 HOTEL BUILDING WEST BAY LAGOON (Falcon Tower) Project Handled Doha Qatar. START Date Mon, 03/01/2010 - 01:00 Read more about Estimator / Quantity Surveyor, SOUTH WEST ARCHITECTURE, Six Star Hotel- 2B + G + PODIUM + 25 HOTEL BUILDING WEST BAY LAGOON (Falcon Tower) Project Handled Doha Qatar.
Preparation of concept, schematic and detailed MEP designed drawings. Designing of complete Fire Fighting drawings. Designing complete MEP Slab, Core Wall, Block Wall Builders work layout drawings. Identification of suitable models and preparing c, ET START Date Fri, 10/01/2004 - 02:00 END Date Sat, 09/01/2012 - 02:00 Read more about Preparation of concept, schematic and detailed MEP designed drawings. Designing of complete Fire Fighting drawings. Designing complete MEP Slab, Core Wall, Block Wall Builders work layout drawings. Identification of suitable models and preparing c, ET