Sr. Planning Engineer, Shapoorji Pallonji Mid East LLC, King Abdullah Financial District (Cluster CP03A)

START Date: 
July, 2017
  • Managing and leading the team of planners.
  • Preparing level 1,2,3,4 & 5 programs along with Schedule basis memorandum, progress measurement procedure, organization chart and logistical plans.
  • Reviewing the baseline Program, S-curves, Manpower Histogram, Cash Flows, etc.

Senior Engineer (Planning & Contracts), Punj Lloyd Limited , Widening and Strengthening of existing National Railway from 2 lanes to 4 lanes from 1093.00 Km to 1121.00 Km of Nalbari to Guwahati section of NH-31 in Assam on East-West corridor, under Phase

START Date: 
July, 2006
END Date: 
March, 2007

·   Participated in the construction of 28km flexible pavement; cross drainage structures, major and minor bridges and railway over bridge with retaining walls

Experience Hours (Planning & Scheduling): 
800
Experience Hours (Cost Management): 
800
Experience Hours (Forensic Analysis): 
400

PLANNING ENGINEER, Gulf Contracting Co WLL, Doha Festival City & Le Mirage Downtown

START Date: 
March, 2014
END Date: 
October, 2017
Project: Le Mirage Downtown (4B+G+M+10+Tech+PH) Mixed Use Building (Contract value: Qar 190 Million
Location: Doha, Qatar)Preparation of resource and cost loaded fidic clause 14 baseline schedule and getting it approved from client.
Updating the programme as per the progress at site, preparation of recovery schedules.
Preparation of Extension of time Claim by Time impact analysis.
critical path analysis of schedule at progress reporting. Various reports – DPR, WPR, MPR (preparation and
tracking).
Experience Hours (Planning & Scheduling): 
5500
Experience Hours (Cost Management): 
1500
Experience Hours (Forensic Analysis): 
500

Lead Planning Engineer, Oilserv, UAE, EPC for Summail Gas Processing Facility Client: DNO.EP & Assembly- Design, Manufacture and Supply of Packaged Water Treatment and Disposal Plants- Client: BP,EPC - Bijell-1B EWT Facility Upgrade – MOL. EPC - Bakrman -

START Date: 
December, 2013
All the Projects Clients are in Iraq - BP, DNO, MOL. • Project Baseline Schedule preparation in Primavera 6.• Preparation of S Curve, Histograms, Budget, and Progress measuring system.• Updating of schedule on a weekly basis in Primavera 6.• Coordinating with the engineering crew to deliver the deliverables on time.• Keeping track of project on a daily basis.• Weekly and monthly reporting which includes cost reporting.• Bi weekly cost reporting.• Alerting the construction team of the ob
Experience Hours (Planning & Scheduling): 
3900
Experience Hours (Cost Management): 
1300
Experience Hours (Forensic Analysis): 
550

Planning Engineer, Pureworld Middle East - Abu Dhabi, Inter Refinery Pipeline – II Client:TAKREER, Oily Water Sump Project - Habshan Facilities - Client:GASCO, Construction of Cathodic Protection of Well Casing - Client: ADCO

START Date: 
July, 2011
END Date: 
November, 2013
• Preparation of Planning Package as per agreed Schedule and WBS Structure.• S Curve Preparation.• Preparation of Effective Project Progress Monitoring System.• Weekly, Monthly and Daily Report Preparation for Client and Management.• Review of Project Progress with Project Construction Team so as to notify of any deviation and corrective actionpreparation.• Project Budget and Cash Flow Preparation.• Project Cost Control and Reporting.• Subcontractor Administrat
Experience Hours (Planning & Scheduling): 
6700
Experience Hours (Cost Management): 
1900
Experience Hours (Forensic Analysis): 
850

Planning Engineer, ARCHIRODON CONSTRUCTION (OVERSEAS), various projects

START Date: 
April, 2003
END Date: 
August, 2006

As Planning Engineer I was Responsible for all the Planning and Cost Control aspects of the Projects assigned. I was reporting to the Project Manager and regional Projects Control Manager.

Planning Engineer, CODE CONTRACTING, Buildings and Water

START Date: 
April, 2001
END Date: 
March, 2003

As Planning Engineer I was Responsible for all the Planning and Cost Control aspects of the Projects assigned. I was reporting to the Contracts Manager. Main responsibilities covered under the role were preparation of cost and resource loaded master schedule, monitoring of actual work against approved schedule and issuing early warnings to relevant department on any deviation, preparation of earned values and comparison with the actual cost to measure the profitability of projects, Preparation of S-curves, monthly reports and preparation of EOT claims.

Construction Planners / Planning Engineers, Georgiou Group Pty Ltd., Pipeline, Land Developments, Roads, Bridges

START Date: 
October, 2013

Member of a Project Control Team for a Construction Group and dealing with Roads & Bridges, Bulk Civil Works, Pipeline Works, Land Development etc.

Planning & monitoring the projects starting from Tendering stage till the finish stage. Dealing with weekly reporting and detailed productivity analysis to track the project. Early warnings for future conflicts or issues, Dealing with EOt Claims & associated Costs.

Experience Hours (Planning & Scheduling): 
1800
Experience Hours (Forensic Analysis): 
100

Senior Planning Engineer, Murray and Roberts Marine, Pump Station and Outfall, Tanjung Bin 4 Power Station Intake

START Date: 
October, 2012

Project Planning Engineer

October 2012 – Present Tanjung Bin 4 Intake, Pump Station and Outfall Pipe, Johor, Malaysia

Management of planning and controls for the design, procurement & construction of cooling water intake, pump station and offshore discharge culverts for a 1000 MW coal fired power plant.

Deputy Project Manager-Planning, Simplex Infrastructures Limited, The World Towers

START Date: 
May, 2012
END Date: 
September, 2015

Worked as Depuety Project Manage- Planning for Simplex Infrastructures Limited. Mumbai for esteemed 'King Tower' project.

Experience Hours (Planning & Scheduling): 
4000
Experience Hours (Cost Management): 
2000
Experience Hours (Forensic Analysis): 
1000