Website Upgrade Incoming - we're working on a new look (and speed!) standby while we deliver the project

UAE

Project Engineer, DOM, UAE, FMCG

START Date: 
September, 2003
END Date: 
June, 2007

Planning Engineer, responsible for EPC project planning, execution, and commissioning

Experience Hours (Planning & Scheduling): 
5000
Experience Hours (Cost Management): 
1500
Experience Hours (Forensic Analysis): 
100

Planning Manager, IMECO, Abu Dhabi, UAE, Oil & Gas \ Infrastructure \ Irrigation and Landscapes\ Heavy Civil Engineering

START Date: 
January, 2009
END Date: 
May, 2010

Oil & Gas \ Infrastructure \ Irrigation and Landscapes\ Heavy Civil Engineering o Prepared pre and post contract program including tentative\planned curve for progress and cash flow tracking for multi-disciplinary projects o Prepared master program based on concept or available information o Prepare, implement & control resource loaded Clause 14.1 program to meet Contractual milestone or Completion date o Design follow up, review & recommend on contract documents, BOQ & drawings o Comparative study\analysis on priced BoQ of contractor based on similar projects o Highlighted

Experience Hours (Planning & Scheduling): 
2000
Experience Hours (Cost Management): 
1000
Experience Hours (Forensic Analysis): 
1000

project manager, qatar, UAE, Saudi Arabia , Pearl Qatar, Rosewood Hotel Abu Dhabi, Hiton Towers Makkah

START Date: 
April, 2008
END Date: 
June, 2015

800x600 Normal 0 false false false EN-US

Planning Engineer / Quantity Surveyor, Giffin Traffiks L.L.C. Abu Dhabi, UAE, Etihad Towers & Others, Seba, Yas Island Road

START Date: 
January, 2010
END Date: 
August, 2011

Planning Engineer / Quantity Surveyor

Project: Subcontractor for Yas Island Road (AED 60 Million), Seba, Etihad Towers & other projects.

Experience Hours (Planning & Scheduling): 
3400
Experience Hours (Cost Management): 
3400

Assistant Project Manager (Planning & Controls), Future Mark Contracting LLC, Dubai, UAE, Satellite Ground Station

START Date: 
March, 2009
END Date: 
January, 2010
• Assisted Project Director with decisions regarding technical approaches, cost, scheduling, risks and performance. • Achieved project targets by inspiring commitment and motivation to the project team. • Prepared contractual requirements related to planning/scheduling, progress measuring & reporting. • Analysed the contract, identified and monitored risks involved. • Identified schedule and cost variances and developed corrective actions for negative variances. • Attended Client and Consultant meetings and lead meetings with Sub- contractors. • Administered the executio

Assistant Project Manager (Planning & Controls), Future Mark Contracting LLC, Dubai, UAE, Satellite Ground Station

START Date: 
March, 2009
END Date: 
January, 2010

·   Assisted Project Director with decisions regarding technical approaches, cost, scheduling, risks and performance.

·   Achievedprojecttargetsbyinspiringcommitmentandmotivationtotheproject team.

·   Prepared  contractual  requirements  related  to  planning/scheduling,  progress

measuring&reporting.

Abubacker Sithik

First Name: 
Abubacker
Last Name: 
Sithik

1.  Project planning & Scheduling

2.  Project Cost Control

3.  Project Resource Management 

4.  Schedule preparation for new proposal

5.  EOT claim notifications and claims preparation

6.  Cost and Cash flow report consolidation and co-ordination with sites and HO

7.  As built schedule preparation for closed projects

Professional Since: 
Aug-2011 (13.4 yrs experience)
Oldest experience: 
Jun 2016 (8.6 yrs experience, WARNING: 4.8 years variance with Professional Since)
Years Experience: 
47

Sr. Planning Engineer, Notredame Metal Construction Co LLC, SHARJAH, UAE, Dubai, Emirates Flight Training and Organization Facilities at DWC

START Date: 
June, 2016
END Date: 
July, 2017
  • Prepare construction program of works related to Civil /Structural/ID /MEP / Firefighting & Fire alarm/ELV discipline wise detailed man-hours , cash flow, dashboards, s-curves using Primavera P6 & MS Project and ensure that the Project Plan reflects the project scope and is fully resourced and cost loaded in reference to the BOQ and Engineering drawings issued for site construction.
  • Prepare Revised Program for the remaining works and recovery program.
  • Check and Update program of works as required for the project through close out, integrating contractor and prog
Experience Hours (Planning & Scheduling): 
2000
Experience Hours (Forensic Analysis): 
500

Lead Planning Engineer, Oilserv, UAE, EPC for Summail Gas Processing Facility Client: DNO.EP & Assembly- Design, Manufacture and Supply of Packaged Water Treatment and Disposal Plants- Client: BP,EPC - Bijell-1B EWT Facility Upgrade – MOL. EPC - Bakrman -

START Date: 
December, 2013
All the Projects Clients are in Iraq - BP, DNO, MOL. • Project Baseline Schedule preparation in Primavera 6.• Preparation of S Curve, Histograms, Budget, and Progress measuring system.• Updating of schedule on a weekly basis in Primavera 6.• Coordinating with the engineering crew to deliver the deliverables on time.• Keeping track of project on a daily basis.• Weekly and monthly reporting which includes cost reporting.• Bi weekly cost reporting.• Alerting the construction team of the ob
Experience Hours (Planning & Scheduling): 
3900
Experience Hours (Cost Management): 
1300
Experience Hours (Forensic Analysis): 
550

Jithin Kambhikanam

First Name: 
Jithin
Last Name: 
Kambhikanam

My greatest experience is the ablity to learn from people i have met and learn new things fast. I was first MEP Planning Engineer for building,Villas and after that by luck i got into as Project Control Engineer in Oil and Gas which doesnt happen normally.I have Site experience in both the field which teached me Construction practices, productivity ratings.

Professional Since: 
Nov-2007 (17.1 yrs experience)
Oldest experience: 
Nov 2007 (17.1 yrs experience)
Years Experience: 
8

Market Place

No results found... (try selecting a different content filter)

Syndicate content