Design & Planning Manager, Mansell Construction, All Regional Projects

START Date: 
March, 2007
END Date: 
June, 2010

Design & Planning Manager for all regional projects. Responsible for all tender and contract planning as well as design coordination on live D&B contracts

Experience Hours (Planning & Scheduling): 
5000
Experience Hours (Cost Management): 
500
Experience Hours (Forensic Analysis): 
1000

Senior Deputy General Manager, Lanco Infratech Limited, Chennai Metro Rail Package ECV-07

START Date: 
September, 2011
END Date: 
January, 2013
• Obtained Approval on Master Programme (Engineering, Procurement and Construction) with Planning Narrative Statement in the first submission. • Obtained Notice of No Objection(NONO) from General Consultants EMBYE on critical construction drawings to create work front for casting of wider segments, Elevated Station and Cut and Cover Tunnel structural Works • Establishment of Interface Management Plan and Traffic Management Plan • Procurement of Subcontracts for Launching Girders, Normal Segments, Wider Segment Moulds, Tunnel Ventilation System Design • Successfully Coordinated with Struct
Experience Hours (Planning & Scheduling): 
2450
Experience Hours (Cost Management): 
2000
Experience Hours (Forensic Analysis): 
1000

Cost and Schedule Controls Manager/Scheduler/Coordinator, EPC Consultants, VTA/BART (SVBX) / Berryessa Extension Project $2.5 Billion- San Jose

START Date: 
February, 2013
END Date: 
February, 2015

 

EPC Consultants, Inc., San Francisco, CA                                          (2013 – 2015)

 

VTA/BART (SVBX) / Berryessa Extension Project - San Jose:

Experience Hours (Planning & Scheduling): 
1300
Experience Hours (Cost Management): 
100
Experience Hours (Forensic Analysis): 
600

Construction/project manager, 8build Ltd, £2.5m Fit out for Alliance Berstein Asset Management Mayfair, £8m grade II refurbishment in South Audley Street Mayfair., £8m major refurbishment of luxary apartments Albemarle Street Mayfair, £9m refurbishment a

START Date: 
June, 2007
END Date: 
May, 2014

I'm employed by a London based principle contractor who specialise in office fit out high end residential projects in London and the South East.  My duties are that of a construction/project manager and have lead and completing various size projects in London.  The majority of my experience has been site and construction management.  However, planning, programming, ,document control and design management are other key areas of my expertise.  I've also been involved in tendering and cost control and have contributed in value engineering excercises.  I've attended man

Experience Hours (Planning & Scheduling): 
1600
Experience Hours (Cost Management): 
1000

Project Engineer, Dragados Canada, DTRRIP

START Date: 
December, 2012

Project Engineer for a Transportation Infrastructure construction project.  Creation and maintaining schedules.

Project Engineer, Dragados Canada, DTRRIP

START Date: 
December, 2012

Project Engineer for a Transportation Infrastructure construction project.  Creation and maintaining schedules.

Design Coordinator & Planning Engineer, Murray and Roberts Middle East, Al Raha Beach, Lu'Luat Island, Private Beach and Jellyfish Island

START Date: 
March, 2009
END Date: 
May, 2010

Four concurrent design & construct sea wall installation projects in Abu Dhabi at Al Raha Beach, Abu Dhabi, UAE

Senior Planning Engineer, Murray and Roberts Marine, Pump Station and Outfall, Tanjung Bin 4 Power Station Intake

START Date: 
October, 2012

Project Planning Engineer

October 2012 – Present Tanjung Bin 4 Intake, Pump Station and Outfall Pipe, Johor, Malaysia

Management of planning and controls for the design, procurement & construction of cooling water intake, pump station and offshore discharge culverts for a 1000 MW coal fired power plant.

Project Planner, MEGA, Ahemadabad Metro rail

START Date: 
July, 2012
END Date: 
July, 2013

·Preparation of L1, L2, and L3 programme for MEGA.

·Preparing budget, cost expenditure for the MEGA.

·Preparation of Design Coordination programme, Document flow matrix, Risk register, Process flow chart, and updating the same.

Preparing SAP - PS for MEGA

 

Project Engineer / Field Controls Manager, JGC Corporation, Bab Field Production Facilities Expansion Project, Abu Dhabi U.A.E. (350 MBOPD)

START Date: 
March, 2003
END Date: 
June, 2005
  1. Coordination with Engineering disciplines & Procurement during engineering phase in Yokohama Japan as Project Engineer
  2. Coordinate with project team members to get required information for cost estimate
  3. Coordination with Vendor regarding engineering & vendor data for finalization of Engineering & Procurement issues
  4. Project planning, monitoring & control to meet the EPC project requirement
  5. Preparation of Project Weekly/Monthly Progress reports for client
  6. Work in collaborative relationships with client in the planning &am