Website Upgrade Incoming - we're working on a new look (and speed!) standby while we finalise the project

EPC

Lead Planning Engineer, Oilserv, UAE, EPC for Summail Gas Processing Facility Client: DNO.EP & Assembly- Design, Manufacture and Supply of Packaged Water Treatment and Disposal Plants- Client: BP,EPC - Bijell-1B EWT Facility Upgrade – MOL. EPC - Bakrman -

START Date: 
December, 2013
All the Projects Clients are in Iraq - BP, DNO, MOL. • Project Baseline Schedule preparation in Primavera 6.• Preparation of S Curve, Histograms, Budget, and Progress measuring system.• Updating of schedule on a weekly basis in Primavera 6.• Coordinating with the engineering crew to deliver the deliverables on time.• Keeping track of project on a daily basis.• Weekly and monthly reporting which includes cost reporting.• Bi weekly cost reporting.• Alerting the construction team of the ob
Experience Hours (Planning & Scheduling): 
3900
Experience Hours (Cost Management): 
1300
Experience Hours (Forensic Analysis): 
550

Senior Project Quantity Surveyor, Contracting & Construction Enterprises Ltd. (CCE), KSA:LOCOMOTIVE MAINTENANCE FACILITY EXPANSION, SAUDI RAILWAYS ORGANIZATION (SRO)Dammam City

START Date: 
July, 2013

·         Analyzed bid drawing with approval or IFC drawing for cost comparison and for potential savings.

·         Prepared detailed takeoffs from division 2 to division 13.

·         Prepared the materials schedule for approval and request for quotation (RFQ).

·         Prepared a cost price breakdown for a new works not included in the BOQ.

Experience Hours (Planning & Scheduling): 
600
Experience Hours (Cost Management): 
20000

PMO Team Leader, Caterpillar, Tier 4i Emissions Project & T4 Final Emissions Project

START Date: 
December, 2009
END Date: 
December, 2011

Dear Fellow Members,

 

As part of my role, as the PMO Team Leader at Caterpillar Articulated Trucks, I had to develop a team of planners from scratch which planned all brand new Caterpillar products from cradle to grave. This included planning activities from a multitude of suppliers from all over the world.

 

We planned and managed all new prototype development and covered engineering, procurement, and construction, from strategy development through to project close out.

Planning Engineer, Wood Group, Offshore Facilities Maintenance and Upgrading, EPCIP of CPSE Water Injection Extension Phase 2 Project, EPCI of Removal of Redundant Facilities

START Date: 
May, 2006

Administered job cards in M-Power, prepared baseline (level-3 and level-4 plan, tick sheet, manning requirement, and histogram); monitored progress (P3 and m-Power update, daily / weekly report, MOM, and issue log); anticipated slippages by means of forecast; and analyzed productivity and other statistics for KPI calculation

Planning Engineer, Sistemyapi, Wastewater Treatment Plant

START Date: 
May, 2008
END Date: 
May, 2010

Planning Engineer - Wastewater Treatment Plant Construction (EPC) Fidic Craiova Romania

Market Place

No results found... (try selecting a different content filter)

Syndicate content