Project Control Manager HOD, Saipem Indonesia, FLOATERS - FLNG

START Date: 
April, 2013
END Date: 
February, 2014

 Project Control Manager Head of Department PT Saipem Indonesia

 

Experience Hours (Planning & Scheduling): 
1000
Experience Hours (Cost Management): 
1000

Senior Planning Engineer, ENI Angola, Angola Block 15/06 East Hub

START Date: 
May, 2014
END Date: 
September, 2015
Senior Planning Engineer for ENI Angola, Operator on the Angola Block 15/06 East Hub (2,500 MUSD) project; to develop the Cabaca South East field, Lower Miocene system, which is located in 470m of water.
Experience Hours (Planning & Scheduling): 
2800

Planning Engineer, Murray and Roberts Middle East, ADCOP oil pipe stringing project

START Date: 
October, 2009
END Date: 
June, 2010

ADCOP marine oil pipe stringing project in Fujairah:

Construction sequencing and progress reporting of connection of steel pipe onshore to offshore PLEM.

Planning Engineer, Wood Group, Offshore Facilities Maintenance and Upgrading, EPCIP of CPSE Water Injection Extension Phase 2 Project, EPCI of Removal of Redundant Facilities

START Date: 
May, 2006

Administered job cards in M-Power, prepared baseline (level-3 and level-4 plan, tick sheet, manning requirement, and histogram); monitored progress (P3 and m-Power update, daily / weekly report, MOM, and issue log); anticipated slippages by means of forecast; and analyzed productivity and other statistics for KPI calculation

Planning Engineer, Mustang Engineering, Alternative Bridge Landing Module (ABLM) on the North Rankin A (NRA) platform

START Date: 
November, 2009
END Date: 
November, 2009

Prepared level-3 and level-4 (deliverables level) plan by P6 c/w histograms aligned with CTRs and SDS (Supplier Documents Schedule); monitored progress; and interfaced with Transfield Worley as construction contractor

Project Control Engineer, Technip, Sisi Nubi Field Development– Phase 1, Onshore Facilities for Gendalo Field Development, Sadewa-Z WHP and Pipelines, Onshore Facilities for Gehem Field Development (Indonesia)

START Date: 
December, 2003
END Date: 
May, 2006

Established the project setup (project coordination plan, project quality plan, schedule, and budget incl. CTR – Cost, Time & Resources); monitored and rectified the implementation (recovery plan, daily / weekly / monthly report, MOM, supervising document controllers); compiled technical documents, such as Scope of Work and Basis of Design; and handled commercial matters of the project (cost report, change order, level-4 cost estimate, and invoicing)