· Analyzed bid drawing with approval or IFC drawing for cost comparison and for potential savings.
· Prepared detailed takeoffs from division 2 to division 13.
· Prepared the materials schedule for approval and request for quotation (RFQ).
· Prepared a cost price breakdown for a new works not included in the BOQ.