Descon Engineering Limited Pakistan

Engineer Planning, Descon Engineering Limited Pakistan, Power Plant Retrofit, Maintenance & Shutdowns

START Date: 
August, 2017
END Date: 
January, 2018

Study, review and fully understand job content and work scopes within the area. 2. Prepare, review and verify Job packages 3. Perform Job walk / site verification to ensure job packages are fully complete and satisfactory. 4. Identify/review requires material 5. Identify resource and equipment requirement 6. Identify critical path for the area 7. Plan and lead his specific area team to meet the target set. 8. To create the contingency plan for critical equipment. 9. To ensure all the task in his area are scheduled properly. 10.

Assistant Planning Engineer planning construction, Descon Engineering Limited Pakistan, shutdown Parco Refinery

START Date: 
September, 2018
END Date: 
July, 2020

Study, review and fully understand job content and work scopes within the area. 2. Prepare, review and verify Job packages 3. Perform Job walk / site verification to ensure job packages are fully complete and satisfactory. 4. Identify/review requires material 5. Identify resource and equipment requirement 6. Identify critical path for the area 7. Plan and lead his specific area team to meet the target set. 8. To create the contingency plan for critical equipment. 9. To ensure all the task in his area are scheduled properly. 10.

Planning Engineer / Quantity Surveyor, Descon Engineering Limited Pakistan, Satpara Dam Project Skardu

START Date: 
May, 2003
END Date: 
May, 2005

Job Profile

Experience Hours (Planning & Scheduling): 
1000
Experience Hours (Cost Management): 
550
Experience Hours (Forensic Analysis): 
800

muhammad faheem

First Name: 
muhammad
Last Name: 
faheem
I am working as Assistant Engineer Contracts at Descon Engineering Limited , New Khanki Barrage wazirabad gujranwala, pakistan. i m Expert in i) Contract Draftingii) Variation Ordersiii) Extension of Timeiv) Claims v) Requests to Dispute Boardsvi) Method StatementsVii) FIDIC viii) Rate Analysis
Professional Since: 
Sep-2014 (10.2 yrs experience)
Years Experience: 
0

Planning Engineer, Descon Engineering Limited Pakistan, UCH-II Power Project 400MW

START Date: 
August, 2011
END Date: 
August, 2013
  • Preparation of Integrated Project Schedule as baseline on Primavera (P6).
  • To determine Scope of work, Work Breakdown Structure (WBS), Organization   
  • Breakdown Structure (OBS) and Work procedures/ Methodologies
  • Preparation of Weekly and Monthly Progress report for client.
  • Analysis & Forecasting of reports and Schedule Plans
  • Preparation of Interim Payment Certificates and Costing
  • Preliminary working on sub-contracting and tendering.
  • Preparation of Rate Analysis of Non BOQ’s item.
  • Prepara

Nouman Zia

First Name: 
Nouman
Last Name: 
Zia
  • Study project scope of work and contractual terms and condition.
  • Prepare project plan level-I to IV and cost control statement as per project milestones.
  • Drawing up plans and preparing resource loaded master schedules in Primavera P6.
  • Plan, organize and supervise for execution of construction activities of the projects according to the schedules.
  • Monitor and control the progress of the project viz.
Professional Since: 
Jan-2001 (23.9 yrs experience)
Oldest experience: 
Jan 2001 (23.9 yrs experience)
Years Experience: 
12

PLANNING ENGINEER, Descon Engineering Limited Pakistan, BHP Zamzama Field Expansion Project

START Date: 
July, 2008

·        More than 12 years of experience in the field of oil & gas development projects.

·        Extensive experience in Project Management, Project Planning & Control, Project Administration, Project Budgeting and Forecasting, Project Monitoring and Cost Control, Earned Value Management, Project Configuration and Change Management, Project Completion and handing over reports.

Planning Engineer, Descon Engineering Limited Pakistan, BYCO oil refinery

START Date: 
December, 2008
END Date: 
December, 2012
  • Preparation of Execution level-3 & level-4 plans on Primavera Project Planner, Indirect and direct manpower deployments.
  • Monitor progress of piping to ensure that the project is progressing as planned and the targets would be met and raise flags if the targets are likely to slip.

Planning & FEDC Engineer, Descon Engineering Limited Pakistan, DG Cement Plant, Kalar Kahar, Punjab, Pakistan

START Date: 
April, 2004
END Date: 
June, 2007

Worked on DG Khan Cement Khairpur, Chakwal, Pakistan

DG Cement Project involves 4500 Tons of equipment fabrication and erection,   having overall 3 Million man-hours. 

 

RESPONSIBILITIES

Khalid Mahmood

First Name: 
Khalid
Last Name: 
Mahmood
Professional Since: 
Jan-2007 (17.8 yrs experience)
Oldest experience: 
Jun 2009 (15.4 yrs experience, WARNING: 2.4 years variance with Professional Since)
Years Experience: 
1

Market Place

No results found... (try selecting a different content filter)

Syndicate content