Senior Planner

senior planner, aljaber-alharbi-khatib & alami.... etc, many projects

START Date: 
January, 1989
END Date: 
November, 2014

Planning on bridges,tunnels,infrastructure and buildings projects

Cost control and I can link it with premavera

System developer . for example : I can create the monthly invoice directly after ubdating the project program.

Also : I am primavera administrator

And I have aducat knowledge about estmaiting project cost for tendering

Senior Planner, Contrack International Inc, FY07 SOF Aircraft Operations, SIDRA Medical & Research Centre and Science & Technology Park

START Date: 
April, 2007
END Date: 
July, 2011

Involved in the construction of a Rotary and Fixed Wing Aircraft Hangar, Squadron Operations Facility, Aircraft Washrack, Fuel Stand Sunshade, Pump Building, Substation Building, Fire Pump Building, Access Apron, Site Supporting infrastructure and utilities at Al Udeid Air Base, Qatar.

Sidra is a World-Class Hospital is rising at Qatar and provides an environment to attract the best healthcare talent in the world. This project is about 200,000 SQM as a Design & Build Package is to be executed with JV of Contrack (Orascom)and Spanish OHL limited.

Experience Hours (Planning & Scheduling): 
6200
Experience Hours (Cost Management): 
3100
Experience Hours (Forensic Analysis): 
1100

Senior Planner, Interserve, Various

START Date: 
March, 2007
END Date: 
October, 2011

Senior Planner on tender and live contracts valued £0.5m - £100M in Civil Enginnering, Water and Energy from Waste Sector.

Senior Planner, BP, West of Shetland Field Developments

START Date: 
October, 2001
END Date: 
March, 2005
Responsible for subsea execution planning on the West of Shetland (WoS) fields; deputised for the WoS Integrated Field Planner. Responsible for the Schiehallion future development schedules, and for the execution planning for smaller regional projects – Buzzard Tie-in Spool & South Everest Gas Leak Repair. Responsible for production of the integrated Subsea Vessel schedule for the UKCS and monitoring for SIMOPS.

PMP, Senior Planner, Tecnicas Reunidas, Resid Upgrading Project, Tüpas

START Date: 
January, 2007

For the last year I have been developing and following the project schedulle of a petrochemical installation project located in Izmit, Turkey.

Also I got the PMP certification in May 2010.

Senior Planner, Black & Veatch Corporation, (various projects)

START Date: 
December, 2006
END Date: 
February, 2008

Schedule generation, maintenance and update

Cost report generation, maintenance and update

Earned Value Analysis

Experience Hours (Planning & Scheduling): 
2000
Experience Hours (Cost Management): 
2000

SENIOR PLANNER, ENPPI, Crude Tank Farm - Aramco

START Date: 
September, 2001

Senior Planning Engineer, Oil and Gas Projects 

 

Duties and Responsibilities:

·         Develops project Work Breakdown Structure (WBS) for large size projects, integrating all project objectives, major milestones and customer / contract requirements.

Senior Planner, Mott MacDonald, Rumaila Oil Field Improved Production Target 2010

START Date: 
June, 2010

Planning Team Leader responsible for establishing a suite of high level programme plans used to actively track sub contractor programmes, development and delivery of weekly progress and dashboard reports in a difficult working environment. 

Senior Planner, Al Meraikhi General Contracting, ADNOC New Hospital Project-Ruwais

START Date: 
July, 2010
END Date: 
July, 2013

Senior Planning Engineer Al Meraikhi General Contracting

(July 19, 2010 - July 16,2013) Abu Dhabi United Arab Emirates

PO Box 53023

Experience Hours (Planning & Scheduling): 
22900
Experience Hours (Cost Management): 
3000
Experience Hours (Forensic Analysis): 
300

Senior Cost Engineer, Senior Planner, Project Controls Manager, Project Controls Management Services Pty Ltd, Buildings, Industrial, Oil & Gas, Petro Chem, Pharmaceutical, PIPELINES, Rails, Refinery

START Date: 
June, 1981

Had over 20 years in the construction industry of combined working experience in the field of oil & gas refinery, pharmaceutical plant, waste water treatment & recycle water treatment plant, high rise building, module assembly, on-shore pipeline installation, power plant, industrial plant  and heavy civil infrastructure.

Market Place