Website Upgrade Incoming - we're working on a new look (and speed!) standby while we finalise the project

Qatar

Ravishankara korikkar

First Name: 
Ravishankara
Last Name: 
korikkar

 
•     Civil Engineering graduate with total 13 years of experience, out of 9 years in Project planning, monitoring, budgeting, cost control, contracts and with an exposure to tendering.

•     Well proficient with planning tools like Primavera Project Planner software Version 3.1, 5.0 & 6.0 v 8.3, MS-Office, AutoCAD.

Professional Since: 
Jan-2000 (24.9 yrs experience)
Oldest experience: 
Jan 2000 (24.9 yrs experience)
Years Experience: 
20

project manager, qatar, UAE, Saudi Arabia , Pearl Qatar, Rosewood Hotel Abu Dhabi, Hiton Towers Makkah

START Date: 
April, 2008
END Date: 
June, 2015

800x600 Normal 0 false false false EN-US

Planning Engineer, Qatar Project Management, Doha, Qatar, Lusail highways and Interchanges infrastructure and landscape project

START Date: 
August, 2011
END Date: 
December, 2016

·   Reviewed/assessedcontractorsProgrammeofworks,reportsandtimeclaims.

·   DevelopedtheMasterProgrammeforLusailEntertainmentIsland.

·   LiasedwithProjectManagerandteamonplanningissuesandmonitoredworks againstcontractualdates.

·   Liaisedwithcontractortogetworkprogressinformationandidentifiedareasof

concernimpactingtheprogramme.

Planning Executive, Lusail Real Estate Development Company, Doha, Qatar, Lusail City Development Project

START Date: 
July, 2011
END Date: 
February, 2010

·   Established   &   monitored   Master   Programme   for   Lusail   City   Infrastructure DevelopmentandassistedinthedevelopmentofBudgetandCashFlow.

·   Analysed  critical  work  packages  and  performed  what-if  analysis  on  Master

Programmetogenerateworstcasescenariosandimpact.

Delay Analyst and Senior Planning Consultant, United Consultants Doha, Qatar, Design and Build of New Office Complex and Car for PWA (Public Works Authority) Assets Affairs, Design and build of Integrated Waste Service system for Ashghal/PWA(Public Works

START Date: 
November, 2015

Managing a Team of Planners involved in Projects Planning and Scheduling; Control and Reporting; and Enforcement of Compliance to Standards.

Standardization of the Core Sets of Schedule Components and Requirements for Schedule Review and Approval.

Effective Constructability and Contractual Review and Analyses of the Schedule Model.

Ensuring Compliance to the Approval Requirements and other Contractual Requirements.

Delivering Cost and Schedule Performance results through the effective application of Performance processes (SPI, CPI, SV, CV and EVM).

Experience Hours (Planning & Scheduling): 
500
Experience Hours (Cost Management): 
500
Experience Hours (Forensic Analysis): 
2000

Olubiyi Salami

First Name: 
Olubiyi
Last Name: 
Salami

A highly experience and certified Planning Engineer with over 10 years of exposure in infrastructure & construction projects engaged in project planning and controlling, cost and resource loading and analyzing delays, EOT claims. Detailed engineering design stage up to the project execution phase. Highly proficient in Primavera Project management (P6), Microsoft Excel and Office Applications.

Professional Since: 
Sep-2015 (9.2 yrs experience)
Oldest experience: 
Mar 2007 (17.7 yrs experience, WARNING: 8.5 years variance with Professional Since)
Years Experience: 
10
Guild Accreditation: 
Awaiting Applicant
GPC Member
GPC Pilot Tester

Advisor - Planning and Scheduling, PROTEC (Professional Technical Services) Doha, Qatar , Design and Build of Reverse Osmosis Desalination Plant and Supporting Infrastructure Work for Qatar Foundation- Educational City, Design and Build of Gantry Cranes

START Date: 
October, 2012
END Date: 
September, 2015

Preparation of Integrated Master Schedules with Primavera P6.

Preparation of Revised Schedules, Monitoring of the Construction activities from time to time.

Structured Schedule Model Development, Maintenances, Monitoring and Control of the Schedule Model.

Development and Preparation of Resource and Cost S-Curves and Histogram.

Development of contract key dates, milestones and plan dates to align with the overall project Schedule/Deliverables.

Experience Hours (Planning & Scheduling): 
2000
Experience Hours (Cost Management): 
2000
Experience Hours (Forensic Analysis): 
2000

Abdulhafiz Suara

First Name: 
Abdulhafiz
Last Name: 
Suara

Program and Project controls professional with experience in strategic planning, scheduling, reporting, cost & budget control for multiple and concurrent large capital projects in multi-national environments. I am a well-organized leader with perfect analytic and presentation prowess using contemporary software including ERPs. I communicate clearly and maturely from the highest level of management through to the lowest level of execution.

Professional Since: 
Sep-2009 (15.2 yrs experience)
Years Experience: 
0

Muhammad Farhan Mallick

First Name: 
Muhammad Farhan
Last Name: 
Mallick

ENGR. MUHAMMAD FARHAN MALLICK

CURRICULUM VITAE

farhan_mallick81@yahoo.com


Nationality                           Pakistani

Professional Since: 
Dec-2004 (20.0 yrs experience)
Oldest experience: 
Dec 2004 (20.0 yrs experience)
Years Experience: 
10

Senior Planning Engineer, MAN Enterprise,Qatar, Holiday Inn Hotel

START Date: 
July, 2010

MAN Enterprise, Qatar (July, 2010 to Present)

Major responsibilities include:

·          Preparation of planning and control procedures for project including detail master schedule using Primavera (P3&P6).

·          Preparation of work breakdown structure (WBS) for construction activities.

Experience Hours (Planning & Scheduling): 
4400

Market Place

No results found... (try selecting a different content filter)

Syndicate content