Guild of Project Controls: Compendium | Roles | Assessment | Certifications | Membership

Project Planner

Project Planner, Innovation Stream, Product Development and Design

START Date: 
February, 2010
END Date: 
October, 2010

Successfully planned projects and allocated resources using Primavera (P6) and further monitored the progress
- Researched the implementation of PMIS (Project Management Information System) based on Microsoft Share Point and PRINCE 2
- Projects involved: Software development, Electronics development and design, Product development and design
- Business marketing; introducing the company to other businesses in the region by emails and presentations at weekly business meetings
- Assigned to provide reports to clients and contractors

Experience Hours (Planning & Scheduling): 
1000
Experience Hours (Cost Management): 
1000
Experience Hours (Forensic Analysis): 
0

Project Planner, John Holland Pty Ltd, Urban Superway

START Date: 
February, 2011
END Date: 
August, 2011

Worked on $812 million Southroad Superway Project - state's biggest Road Infrastructure project to build 4.8 kilometre non-stop corridor, comprising of a 2.8 kilometre elevated roadway with multiple lanes in each direction and an at-grade service road along the majority of the corridor beneath the elevated roadway structure.
Elevated roadway viaduct comprises of 741 Piles, 68 Pile caps and 68 Piers, 2200 Concrete Segments.

Project Phase: Construction

Site based role

Project Planner, Bombardier Transportation, SSL (Sub surface lines) London Underground

START Date: 
March, 2005
END Date: 
September, 2008

Lead project planner reporting to the project control manager Bombardier Transportation within London Underground Projects Division. Rolling stock and signalling integrator. Role involved managing all programme matters for the Sub Surface line contract for the delivery of 1300 underground vehicles and the re signalling of the applicable lines of London Underground.

Project Planner, Bombardier Transportation, LERL, SBB, Southern

START Date: 
September, 2008

Currently a project planner within the engineering/ design department at Bombardier Transportation (rolling stock and systems integrator) train design and manufacturing company. Developing programmes to deliver the design/engineering of rail vehicles usually to very tight timeframes. Manage programme for engineering team for the LERL project for new vehicles to operate from Stansted. This project was a significant amount of man hours and a two year duration from project start to first vehicle into service. This project was successfully delivered on time.

Project Planner, Various Companies, Various

START Date: 
October, 2008

Developed loads of experince thorugh the use of Asta Power Projects. Currently producing loads of programmes for tenders & well as live jobs, i.e. progressing etc etc.

Project Planner , Faithful & Gould, Stiefel Tranfer project

START Date: 
April, 2010
END Date: 
October, 2010

Assist in converting plans from MSP 2007 and producing project plans in P6 ready for updating. 

Project Planner, Balfour Beatty Utility Solutions, Asset & Facilities Management - (Anglian Water Contract)

START Date: 
March, 2010
END Date: 
August, 2010

Project Planner                                                                                March 2010 – Aug 2010

Balfour Beatty Utility Solutions, Lincoln – (Water & Gas Assets Management Contract)

 

Project Planner, BP, NOP

START Date: 
September, 2011
    • Develop the Project Planning/Scheduling Controls strategy, plans and procedures, reflecting both BP, (JV) and contractor roles and responsibilities.
    • Provide the necessary schedules to ensure the development of proper estimates and studies within a project stage and for sanction.
    • Coordinate and/or develop appropriate internal and external schedule benchmarks/technical limits.
    • Prepare and implement project wide WBS/CBS, working with the Cost Engineer
    • Ensure the preparation and development of appropriate detail and summary project cont

Project Planner, Snamprogetti S.p.A., Qafco 5 - Urea and Ammonia Plant

START Date: 
September, 2007
END Date: 
October, 2008

Project Planner: Developing and updating Schedule and Monitoring Procurement Progress and Situation

Project Planner, PPC, Bordolano Gas Storage Plant

START Date: 
September, 2006
END Date: 
September, 2007

Bordolano Gas Storage Plant - Bordolano (Italy) - 2006-07 - PPC 

Project Planner

Market Place

Primavera P6 and Microsoft Project books, on-line video training courses and training material available from an internationally recognised publisher. Teach yourself using on-line or book based learning or run your own in-house or public courses.
Syndicate content