Project Planner

Project Planner, Jurong Engineering Limited, IRPC CHP Project

START Date: 
October, 2009
END Date: 
June, 2011

Monitor, update, analyze and report project progress and forecast to client, top and site management using Primavera P6 and various analyzing tools such as critical path method, milestone trend analysis and s-curves. Preparation of weekly and monthly progress reports.

Project Planner, FLSmidth A/S, Different Projects,including the Allepo cement plant

START Date: 
August, 2007
END Date: 
March, 2008

Project Planner

Proposal plans, client project plan proposals

Allepo cement plant

ATLAS superuser

Primavera 5.0 superuser

MS Project

Project Planner, BHP Billiton, Olympic Dam Projects

START Date: 
April, 2011
END Date: 
December, 2011

My role includes the development and monitoring of project schedules of capital asset growth projects from engineering, construction through to commissioing, for BHP Billiton Olympic Dam in South Australia. Olympic Dam is located 550km north of Adelaide and contains an unique ore body consisting of uranium, copper, gold and silver.

Project Planner, Magnox, Nuclear

START Date: 
January, 2005

 

 

1 years experience working as a project planner responsible for five projects using Primavera P6.

<

PROJECT PLANNER, B.T. ENGINEERING PTE LTD, FPSO CIDADE DE PARATY SHIP CONVERSION

START Date: 
September, 2010
END Date: 
January, 2011

Responsible to ensure all planned schedule activities are properly implemented according to project work scope.

• Provide assistance to Project Manager and the project team in preparation, analyze

Project Planner, Thermax Limited, BOILER

START Date: 
December, 2006
  1. Preparing & updating L2 schedule for Projects.
  2. Preparing & updating S curves
  3. Preparing & monitoring shop loading plan for in house manufactured pressure parts.
  4. Maintaining Master Production Schedule & load balancing for different shops and lines.
  5. Monitoring Delivery of Critical items like Drum, Panels, radiation Coils and convection modules etc
  6. Resolution of critical issues related to these items by allocation of adequate resources
  7. MIS reporting for progress achieved, critical issues and OTP
  8. Prepari

Project Planner, Mighty River Power, All Major maintenance projects

START Date: 
February, 2011

Project Planner

Planning of major maintenance schedules including internal resources & financial forecasting

Project Planner, SSE Renewables, Greater Gabbard Offshore Windfarm

START Date: 
September, 2009

Planning Engineer                    

Planning using P6 (V7) and Claims support for

  • Greater Gabbard Offshore Windfarm (On project since start of construction)
  • Galloper Offshore Windfarm (Under Development).
  • Tidal and Wave Projects (Brough Head, Costa Head and Cantick Head, Under Development)

 

Principle Responsibilities:

  • Develop the Greater As built program based on Team and supplier inputs,

Project Planner, Wade Walker, Medupi Power Station Construction

START Date: 
August, 2008

Currently planning a construction of a power station. The Medupi power station is located in Lephalale near the Matimba Power Station.

PROJECT PLANNER, MAKYOL CONSTRUCTION CO, BATINAH COASTAL ROAD PROJECT

START Date: 
February, 2010

planning, scheduling, progress, cost, cash flow, material requirement, design, databases