Website Upgrade Incoming - we're working on a new look (and speed!) standby while we finalise the project

PROJECT ENGINEER

Project Engineer, Samerth Trust, Construction of 625 nos earthquake resistant houses

START Date: 
October, 2001
END Date: 
November, 2002

Responsible for overall supervision and execution of construction of 625 nos earthquake resistant houses for 2001 earthquake victims and a hospital for paraplegics with adherence to relevant standards in an area, consisting 28 hamlets, around village Gagodar, Kutch.

Project Engineer, Reitz India limted, Reliance Maiher Proejct etc

START Date: 
February, 2012

Riyaz Ahammed.Shaik

Email Id: riyazahamed.340@gmail.com

Mobile No: 08341112621

 

Professional Experience:-

 

Chalapathi Institute of Engineering and Technology                     March 2014 - Present

Project Engineer, Saudi Building System (Juffali-BUTLER), Design of more than 70 steel structure projects

START Date: 
April, 2000
END Date: 
December, 2005
Involved in designing of steel structures such as shopping malls, accommodation & office buildings, showrooms, aircraft hangars, sports facilities, warehouses, etc based on latest international codes and standards (UBC, IBC, MBMA, ASCE, ANSI, AISC, LRFD, BS, AISI) using several software to produce optimized designs using 3D and composite design

Project Engineer, Field Engineer, Various companies - most are now out of business!, Power, T&D and Civil

START Date: 
September, 1992
END Date: 
January, 2008
  • Led the Engineering team for the construction execution of submarine cable, overhead transmission line, substation, building and underground cable projects;
  • Led the development of project controls processes and standards;
  • Led the development and update of project schedule, cost report, cash flow, progress billing, KPI report, progress report, daily report, resource planning, curve and histogram;
  • Led the development of labor, materials, equipment, cutting list and cost estimates and construction methodology and sequence;
  • Pre-approved the progress billings

Project Engineer, Mowlem Ltd, Refurbishment

START Date: 
November, 2001
END Date: 
December, 2002

Project: Refurbishment of an historical building into luxury houses (approx. US$ 8.7M, execution phase)

Experience Hours (Planning & Scheduling): 
1000
Experience Hours (Cost Management): 
0
Experience Hours (Forensic Analysis): 
500

Project Engineer, Schlumberger, WHP-1 and 2

START Date: 
February, 2012
END Date: 
February, 2014

·     Project manager for the construction of 4 drilling rigs modules (OSX WHP 1&2). Project was a consortium with Norwegian companies and had interfaces in Singapore, Vietnam, Houston and Brazil offices. Multicultural project. Contract value of U$ 22M.

·     Responsible for the working group to implement a PMO in SAM.

·     Focal point for Project Management of M-I SWACO in SAM.

PROJECT ENGINEER, Patel enginneering Ltd, Parbati Hydroelectric Power Project

START Date: 
April, 2009
END Date: 
February, 2011

 

·            Development of Reporting system & Master Project Schedule from scratch (L0 to L4)

·            Preparation of Invoices & subcontractor performance Measurements

·            Updating, Rescheduling & setting targets in all disciplines using PRIMAVERA V8,3

Experience Hours (Planning & Scheduling): 
4000
Experience Hours (Cost Management): 
3500
Experience Hours (Forensic Analysis): 
1000

PROJECT ENGINEER, Mukand Steel, furnace, treatment plant

START Date: 
August, 1993
END Date: 
June, 1997
  1. MUKAND LTD.BOMBAY, INDIAfrom August 1993 to June 1997 in the Projects department.(MUKAND was a U.S. $ 400 million in 1997, having business in turnkey projects, machine building & steel)

Worked as a Project Engineer. Engaged in Project Engineering, Costing, Planning, Commissioning & Preventive maintenance activities.

Major Projects implemented :

Experience Hours (Planning & Scheduling): 
4000
Experience Hours (Cost Management): 
2000
Experience Hours (Forensic Analysis): 
2000

Project Engineer, Bids & Tenders preparation, Estimator, QS and scheduler, D.L. Cervantes Construction, Medium Rise Buildings

START Date: 
November, 1995
END Date: 
February, 2001

   Duties and Responsibilities:

 

·         Assigned as team head in the preparation of bid proposals.

·         Prepare cost estimates, quantity/materials take-off, master schedule, manpower and equipment schedules, bar chart, S-Curve, Pert-CPM, manpower histogram and detailed schedule.

Project engineer, TRAGS engineering and contracting division, Procurement, Construction and Installation contract with RasGas

START Date: 
November, 2007

§  Spearheading efforts across the entire gamut of responsibilities including supervising of construction activities, installation, erection & commissioning of mechanical equipments.

§  Monitoring the project from start to finish and make any necessary changes along the way through change control process, ensuring swiftly ramping up of the projects within the pre defined time and budget parameters without compromising on safety, quality and environmental requirements.

Experience Hours (Planning & Scheduling): 
7050
Experience Hours (Cost Management): 
4300

Market Place

No results found... (try selecting a different content filter)

Syndicate content