Website Upgrade Incoming - we're working on a new look (and speed!) standby while we deliver the project

PROJECT ENGINEER

Project Engineer, Scheduler, McCarthy Building Companies, Solar and Commercial

START Date: 
August, 2016
  • Designed, planned, optimized, managed, and provided in-field and engineering support for self-perform post install for over 100,000 posts on a 130MW solar project
  • Developed an accurate, visual, and numerical tracking method to help monitor and plan entire jobsite.
  • Worked with contracts and managed subcontractors work, cost issues, change orders, and schedule.
  • Maintained and documented any design changes and as-built installs.
  • Provided input and helped develop methods to ensure office and field goals were aligned by providing more immediate feedback and p
Experience Hours (Planning & Scheduling): 
500
Experience Hours (Cost Management): 
500
Experience Hours (Forensic Analysis): 
200

Project Engineer, ARCADIS, Pumping Stations

START Date: 
July, 2012
END Date: 
October, 2016

Project Engineer - Arcadis. Design of water and slurry pumping sistems, projec management and costing.

Experience Hours (Planning & Scheduling): 
3000
Experience Hours (Cost Management): 
1000
Experience Hours (Forensic Analysis): 
500

Project Engineer, ARCADIS, Pumping Stations

START Date: 
July, 2012
END Date: 
October, 2016

Project Engineer - Arcadis. Design of water and slurry pumping sistems.

Experience Hours (Planning & Scheduling): 
3000
Experience Hours (Cost Management): 
1000
Experience Hours (Forensic Analysis): 
500

Regional Engineer, Building Site Manager, Cost Engineer, Project Engineer, Tetra Tech, GIZ-IS and ETG, Building projects (from G+1 to G+19) and Road projects

START Date: 
October, 2006

CAREER HISTORY

Distribution Company – Tetra Tech

Regional Engineer – Feb 2016- To-date

Duties and Responsibility

Ø  overseeing the projects from beginning to end;

Ø  determining the objectives and plans of  projects;

Ø  managing the construction budgets all projects;

Ø  making sure that construction is progressing according to schedule

Experience Hours (Planning & Scheduling): 
1000
Experience Hours (Cost Management): 
1100

Project Engineer, Ahamed Hassan For General Contracting, Complex Building Phase 1

START Date: 
December, 2012
END Date: 
October, 2015

Complex Building Phase 1. Residential complex Building with 8.200 square meters with total budget equal to 16.2 millions US dollars.

Assist on project feasibility study and agree on development objectives.

Determine work responsibilities for each department.

Assist in managing resources. Assist in defining project phase and activities sequence.

Assist in developing / Tracking project budget and milestones

Meet construction budget by monitoring project expenditures.

Ensure all necessary hand over documentation is delivered.

Experience Hours (Planning & Scheduling): 
650
Experience Hours (Cost Management): 
250
Experience Hours (Forensic Analysis): 
350

PROJECT ENGINEER, BST Services, Chachar Gas Plant Relocation Project, and so on,

START Date: 
April, 2013
END Date: 
November, 2014

JOB RESPONSIBILITIES

 

o   HAZOP Scriber for HAZOP Study under the supervision of HAZOP Chairman & developed HAZOP detailed Report

o   Project Scheduling in Primavera P6 & MS Project 2010

o   Controlling & Monitoring Project Schedule and Resource Loading & S-Curves

Experience Hours (Planning & Scheduling): 
3500
Experience Hours (Cost Management): 
450
Experience Hours (Forensic Analysis): 
300

Project Engineer, Pan Engineering, Industrial Building Construction

START Date: 
April, 2007
END Date: 
July, 1996

Projects Site Engineer, Scheduler     

M+W Group, Singapore.

 

From-  Nov’ 2005

To- April 2007

 

·        Supported and promoted the Health and Safety Program to meet the organizations objectives

Experience Hours (Planning & Scheduling): 
3000
Experience Hours (Cost Management): 
3000

Project Engineer, Kwongsoon Engineering, Ship Building and Repairs/ Special Vessel Pipe laying

START Date: 
May, 2011
END Date: 
May, 2015

Project  Engineer

Kwongsoon Engineering Pte Ltd, Singapore

 

From-  May 2010

To- May 2015

 

·        Preparing Project schedules and technical specifications towards the successful execution & commissioning of projects.

Experience Hours (Planning & Scheduling): 
10100
Experience Hours (Cost Management): 
10100
Experience Hours (Forensic Analysis): 
10100

Project Engineer, New Golden City Builders, Shopping Malls, High rise Commercial and Residential Buildings

START Date: 
July, 2004
END Date: 
August, 2008

Involved in building construction of shopping malls, high rise residential and commercial buildings, cinemas and solid waste treatment plant : Scope of work consists of preparation of shop drawings to show and clarify any discrepancies that seen in the construction plans. Ensure that the construction is completed in accordance with the construction drawings, specifications, and quality plans and meet contractual requirements. Attend coordination meeting with Construction Management for the smooth flow of the project.

PROJECT ENGINEER, Cekap Technical Services Sdn Bhd, 1. PMC for Zuhal East Development Project 2. PMC for Development of Layang Wellhead Platform

START Date: 
August, 2012
END Date: 
August, 2016

Area of Experience: Contract Management For some project, I am responsible for the contractual management and administration of the project which includes the following: • Establish standard procedures and guideline that conform to the project terms and conditions. • Execute & manage contracts entered into with vendors and contractors to uphold to the project and company’s term and conditions. • Provide administrative support to the project team and support team which includes project meetings and travel arrangement, general procurement activities.

Experience Hours (Planning & Scheduling): 
50
Experience Hours (Cost Management): 
50
Experience Hours (Forensic Analysis): 
50

Market Place

No results found... (try selecting a different content filter)

Syndicate content