PLANNING ENGINEER

PLANNING ENGINEER, Transtel Engineering Pte. Ltd., Various Projects Handled

START Date: 
November, 2009
END Date: 
November, 2010

MAJOR PROJECTS HANDLED: Rhourde Nouss CTH Project (Algeria); Manifa Project (KSA); Jubail Export Refinery (KSA); Green Diesel Project (UAE); Kharir PAGA/Telecommunication Project (Yemen); Karan Offshore & Onshore Project (KSA); Habshan 5 Utilities & Offshore Project (UAE); New Booster Station BS-160 (Kuwait); Sakhalin-1 Project, Arkutun-Dagi Field Dev (Russia);
 

Planning Engineer, Sistemyapi, Wastewater Treatment Plant

START Date: 
May, 2008
END Date: 
May, 2010

Planning Engineer - Wastewater Treatment Plant Construction (EPC) Fidic Craiova Romania

Planning Engineer, Costain Oil, Gas & Process, Underground Gas Storage Plants

START Date: 
November, 2008
END Date: 
March, 2012

• Both office & site based, performing a planning function for the successful implementation of the Holford Underground Gas Storage Project (e.on) at Byley, Cheshire.
• Creating detailed schedules (level 4) for various aspects of the project, and maintaining them current.
• Creating / updating tracking spreadsheets / presentations for the above project.

Experience Hours (Planning & Scheduling): 
6650

PLANNING ENGINEER, Square General Contracting Co. (L.L.C.), Dubai (UAE), Florence) at Jumeirah Village, Siena, Tuscan Residences (Arrezo

START Date: 
May, 2009
END Date: 
October, 2010

Job Responsibilities:

Experience Hours (Planning & Scheduling): 
3000
Experience Hours (Forensic Analysis): 
1500

PLANNING ENGINEER, Awal Building Contracting Co.LLC, 2 Nos. G+6 Buildings (Sharjah) Structural Steel (Fabricated) Factory at Umm Al Quwain Industrial Area

START Date: 
January, 2006
END Date: 
July, 2007

Job Responsibilities:

  • Preparation, submission and updating of the project master program
  • Recording progress of the project by comparing with the target project.
  • Submit weekly and monthly progress reports.

Projects:

  • 2 Nos. G+6 Buildings (Sharjah)
  • Structural Steel (Fabricated) Factory at Umm Al Quwain Industrial Area
Experience Hours (Planning & Scheduling): 
3000

Planning Engineer, Alemara Engineering, Slawi Infrastructure

START Date: 
November, 2008
END Date: 
February, 2011

Project Planning and Scheduling Engineer responsible for reviewing and approviing of Contractor's Project Baseline, Schedule Update, and monitoring Contractor overall performance.

PLANNING ENGINEER, Expert Systems Pvt Ltd, Lahore, Punjab Government Servants Housing Scheme

START Date: 
August, 2006
END Date: 
January, 2010

 

  1. Preparation of Master schedule using primavera p6 including resource & cost loading.
  2. Schedule update & progress monitoring.
  3. Generating weekly & monthly reports including ‘S’-curves for Client & management review.
  4. Generating progress report for site management review and analyzing current status of projects.
  5. Cost control by Optimization of Resources utilization.
  6. Preparation of Interim Payment Certificate
  7. Submittals for Project Execution (Bar Bending Schedule, Shop Drawings, etc)
Experience Hours (Planning & Scheduling): 
6000
Experience Hours (Cost Management): 
6000

Planning engineer, Chicago Maintenance and Construction Co LLC, GEMS Schools in Dubai

START Date: 
June, 2013

Planning and scheduling the project programme. Monitoring all the activites in detail and WBS level.

PLANNING ENGINEER, Overseas AST LLC co, Construction & EPC projects

START Date: 
June, 2008
END Date: 
August, 2009

1) Participate in bid and tender meetings, site visit and queries
2) Review of contracts, scope of work
3) Prepare execution plan, WBS and schedule of activity based on contract scope
4) Coordinate with estimating and operational group for budget and work schedule activity
5) Prepare cash flow based on estimated budget and integrate to schedule for resource loading
6) Monitor, track and update project status, and preparation of report for submittals
7) Perform schedule analysis for delays and impact to the existing schedule
8) Preparation of mitigation, recovery plan, a