PLANNING ENGINEER

Planning Engineer, Alstom Power Systems GmbH, 2x800MW Coal Fired Power Plant Westfalen D+E, Hamm, Germany

START Date: 
May, 2010
END Date: 
August, 2010

Detail schedule development, development of schedule templates, setting up Progress Measurement System, Primavera P6, SAP

PLANNING ENGINEER,3 Years, ETA - M & E Division, Barwa City

START Date: 
December, 2009

Current Role

  1. ProjectExecution Planning Level 3 & Level 4, Material, Procurement & Shop Drawing Production Planning
  2. Decision and Risk Analysis (D &RA)
  3. Creating Baseline Contract Programme
  4. Critical path method (CPM) analysis, variance analyses, floats analysis and schedule trending.
  5. Schedule development, management and change control, claim defense, engineering and construction methods, commissioning and start up planning, critical path and trending analysis and high profile presentations.
  6. Producing Level 2 Tender Pr

1.“planning engineer”, SDC, Buildings Compounds / High Rise Buildings

START Date: 
June, 2008
END Date: 
January, 2011

Responsibilities:

- Review / approve contractor’s work programs submissions.

- Advise and assist the contractor in the development of the work programs.

- Record and report the actual progress of the work versus the planned work.

- Generate critical milestones for the construction stage for inclusion in ten

Planning Engineer, PEMAC-PROJECT PLANNING AND SCHEDULING MANAGEMENT, Airport, Buildings, Hospital

START Date: 
December, 2006
END Date: 
October, 2008

Following are the Major Projects Planned (Scheduled) during this interlude.

250 Beds Sheikh Khalifa Bin Zayed Al Nahyan Hospital (C.M.H.) - Muzaffarabad.

250 Beds Sheikh Khalifa Bin Zayed Al Nahyan Hospital (C.M.H.) - Rawalakot.

Metro Cash & Carry, Sargodha Road, Faisalabad.

Mubarak Center – Sales Center (Formerly known as Zayed Center Lahore), Lahore.

Sialkot International Airport (Terminal Building & Architectural Works), Sialkot.

Expo Center, Lahore.

Pace Barka Project (Hayyat Regency Hotel) with Trident Construct (Pvt.) Ltd. Lahore.

Planning Engineer, Bentini S.p.A, GNL-3Z

START Date: 
January, 2010
END Date: 
January, 2011

v  Prepare, maintain and control integrated lower level progress measurement system.

v  Visited the project site regularly for periodic progress report and evaluation.

v  Worked with Project Manager for support in the productive and timely completion of the project.

v  Attended progress meetings and reported on the project situation.

Experience Hours (Planning & Scheduling): 
2000
Experience Hours (Forensic Analysis): 
1000

Planning Engineer, Corus/Tata, Blast Furnace 4 Recovery/Refurb, Various others

START Date: 
October, 2008
END Date: 
June, 2010

During my time with Corus I was employed by the Ironworks department as a Planning Engineer, responsible for planning asset maintenance and improvements, following the Corus Asset Management Framework.  Initially I worked on a large-scale refurbishment project of a Blast Furnace, with business requirements later necessitating a move to a ‘live’ operational environment.

 

Mar 2009 – May 2010             Planning Engineer, Corus Strip Products (Granular Coal Injection De

Planning Engineer, Al-Kubaisi Engg. Const. Co. LLC, Erection of steel structures, mechanical, piping, maintenance & shut-down works

START Date: 
October, 2000
END Date: 
December, 2001

Umm-Al-Quwain based Engineering and Construction Company dealing in fabrication and erection of steel structures, mechanical, piping, maintenance & shut-down works.

Position: Planning Engineer
Project plan development, project plan execution and overall change control of project such as mechanical, structural, piping, maintenance and shutdown works.
Preparation of schedules, charts, reports and programs using project management software for various projects.

Planning Engineer, Green Style Architecture, Noor-Al-Maarif School Project

START Date: 
January, 2002
END Date: 
October, 2002

Dubai based European Consultancy firm dealing in design and execution of Architectural, Civil & MEP Projects. Design and execution of Noor-Al-Maarif school project, Sheikh Zayed road, Dubai
Position: Planning Engineer
Preparation of baseline project bid schedules & other project control documents.
Preparation of Level 1, 2, 3 & 4 project control schedules
Preparation of manpower histogram & progress "S" curves
Preparation of estimation, scope of work, bill of quantities and material list
Compilation of ITB package for tendering

Planning Engineer, CH2MHill VECO Engineering Abu Dhabi UAE, ADCO – EPC Services for Asab Water Injection Upgrade Project (UAE) •ADCO – FEED, Detailed Engg & Procurement Services for Huwaila Field Development Project (UAE) •CNPCIS – EPCM for FULA Field Dev

START Date: 
November, 2002
END Date: 
November, 2005

 

VECO (currently CH2M HILL) is a US based Multi-national Corporation that provides project management, engineering, procurement, construction, operations and maintenance services to the Oil and Gas Industry. Major clients are ADCO, GASCO, ZADCO, ADMA-OPCO, Qatar Petroleum, Dolphin Energy Ltd., GAIL (India), GNPOC (Sudan), PDOC (Sudan), CPECC/CPE/CNPCIS/JPPDI (China) etc.

Position: Planning Engineer

Main Responsibilities:

planning engineer, Punj Lloyd Ltd, Tankages, and refineries

START Date: 
March, 2010
  • responsible for co-ordination of their technical areas and co-ordination with other discipline specialists where areas interface or overlap. Review, co-ordination and consolidation of comments for all deliverables associated to the area of specialization.
  • Receipt and tracing of all deliverables and responses to EPC Contractor following Approval / endorsement by Company.