Primavera

Site Scheduler, Shimizu Corporation, BP Indonesia, Tangguh LNG Project in Papua - Indonesia

START Date: 
May, 2005
END Date: 
May, 2008

Person In charge for for planning and scheduling in Project Control Department

Make duration, sequence & planning, tracking actual work progress at site like pipe rack, tech structure, shelters, design of RCC structures, structure foundations and equipment foundation, in General Civil design including various plant drainage systems, paving, roads, cable trench etc, in design of Dynamic Equipment foundations with Microsoft Project & Excel 2003, combine with PRIMAVERA based on Engineering Drawing, specifications and Data Series.

Civil Planning Engineer (Civil, Power & Mechanical), Water, LINDENBERG-EMIRATES L.L.C. & GAMMA FOR TRADING & CONTRACTING, Planning Departement (Many Projects)

START Date: 
May, 2006

I am Working in LINDENBERG EMIRATES L.L.C. as a Planning Engineer since May 2008

And i was working in GAMMA for Trading & Contracting from May 2006 up to May 2008

Planner / Project Manager, Various, Various

START Date: 
October, 2001
END Date: 
October, 2009

Construction Site Project Management.  On Various New Build , Refurbishment Projects to the value of  £15m.

 

Working within the Commercial , Pharmaceutical , Decent Homes , Residential , Leisure and Civil Engineering Sectors

Lead planner / Planning Manager, ITA for TECHNIP France (BURULLUS subsea Project), Structures, Subsea installation of Rigid, Umbilicals and Flexibles in Egypt

START Date: 
April, 2010
END Date: 
October, 2011

ITA – Missionwith TECHNIP (Sub sea Branch) for BURULLUS 

 « Planning Manager for a project of sub sea installation in Egypt »                               

Tasks:       

Planning Manager:

Construction / Fabrication Planner , ITA for TECHNIP France (BP Subsea Project), Subsea installation in Angola

START Date: 
January, 2009
END Date: 
April, 2010

ITA – Mission with TECHNIP (Sub sea Branch) for BP

« Planning support for a project of sub sea installation in Angola »         

Tasks:       

Construction / Fabrication planner:

  • Realization of level 4 fabrication schedules for Angolan base (piping and structures) and coordination with other projects realized in parallel.
  • Co

Lead planner / Planning Manager, ACTISYS for ALSTOM Power , 2x55MW power plant in New-Caledonia (PRONY Bay)

START Date: 
October, 2004
END Date: 
October, 2005

ACTISYS – Mission for ALSTOM Power – La Courneuve (93)

« Planning Manager for a project of a 2x55MW power plant in New-Caledonia (PRONY Bay) done by a consortium between ALSTOM Power France and ALSTOM Power Australia »

Tasks:       

Planning Manager of PRONY consortium:

  • General rebuilt of existing schedule of the first unit (MS-Project)
  • Schedu

Senior Planning Engineer, Orascom Construction Industries, Central Processing Facilities Phase 1 & 7, El-Merk, Algeria

START Date: 
April, 2010
  1. Create, maintain and updating Master Schedule (using Primavera Version 6).
  2. Create Construction Schedule / Shop Drawing Schedule in level 4/5.
  3. Work performance analysis using KPI.
  4. Making Earn Value Analysis report to management.
  5. CPM analysis.
  6. Oversee any possible delay of work and prepare catch up plan.
  7. Monitoring and recording progress day by day and ensure that the data entered into the master schedule is correct.
  8. Create and update PMS (Project Measurement System).
  9. Monitor progress and schedule of Engine

Lead Planner, National Nuclear Laboratory, NEXIA Solutions, Legacy Ponds and silos

START Date: 
February, 2005

I'm a highly motivated Lead Planning Engineer with six years planning and costing experience at the National Nuclear Laboratory (NNL). A well-respected and qualified team member who consistently works to the highest standard and thrives when working as part of a project team. A conscientious, driven performer who develops future procedures at NNL and mentors new members of staff.

 

Major Achievements

 

Project Planner, AMEC, London Underground Power Upgrades

START Date: 
June, 2008
END Date: 
September, 2008

Producing Conceptual Design Statement’s on upgrading the power to Metropolitan, Circle & District lines. Working out of Royal Mint Court, London. My role as Project Planner required me to co-ordinate team efforts when the manager was unavailable. My primary responsibilities were to monitor and update the schedule, make alterations where required, input expended man hours and compile Earned Value reports. I also attended daily review meetings with the project manager and CDS champions to ensure current progress reporting was accurate.

Project Controller, AMEC, DOW De-Commissioning Project

START Date: 
November, 2009
END Date: 
March, 2010

Working as Project Controller based at the DOW Chemicals EOEG Plant on the Wilton site, I managed the production of a fully resource loaded Level 5 Decommissioning programme with a value of £7million for Process Division. As part of this I am the first AMEC employee to successfully use the PICS database system and Primavera 6 together. This involved using the SDK to automate the integration between MS Access & P6.