Egypt (AF.EG)

Corporate Lead Planning Engineer, ARCHIRODON CONSTRUCTION (OVERSEAS) Co.S.A., All tender & Project Planning on a variety Building & Construction projects

START Date: 
June, 2016

Planning and creating time schedules for tender projects as well as baseline creating for awarded projects .

Experience Hours (Planning & Scheduling): 
900

Site Cost Lead, Tecnicas Reunidas, LNG Seagas Damietta (Egypt)

START Date: 
July, 2003
END Date: 
September, 2004

I worked as the LSTK EPC contractor for construction of LNG Train in Damietta, Egypt.  Project was a JV of KBR, JGC, Tecnicas Reunidas, and M.W. Kellogg. This project was extremely schedule driven, and the challenge was to reduce project costs without impacting the overall progress.  I did this through rigorous change management, detailed cost control down to WBS+5 level, and a very indepth manpower plan to ensure the right mix of talent stayed on the project.

Experience Hours (Planning & Scheduling): 
0
Experience Hours (Cost Management): 
2000
Experience Hours (Forensic Analysis): 
0

Eman Abdeen

First Name: 
Eman
Last Name: 
Abdeen

 

1. Computer Skills:

·     PCM v.14 -  P6 - Auto Cad 2D - ICDL  & Microsoft Office (Word, Excel, net, .. etc) - Adobe Acrobat

2. Personal Skills:

    ·  Reading - Internet Search

 

Professional Since: 
Sep-2009 (15.4 yrs experience)
Oldest experience: 
Aug 2016 (8.4 yrs experience, WARNING: 6.9 years variance with Professional Since)
Years Experience: 
46

Document Control Lead, The Arab Contractors (Osman A. Osman& Co.), AbuQir Power Plant

START Date: 
August, 2016

I graduated from the faculity of Engineering, Alexandria Univerisity in 2009 and get my deploma in construction Management in 2014 and now I am preparing my thesis for Master of science in construction management.

I work for the Arab Contractors Co.- Alex. Branch from August 2009 till now.

Now I am working in the Arbitration and claims department since August, 2015.

From January 2014 till July 2015, I worked in the Alex sector follow up department (Follow up projects and reporting).

Experience Hours (Planning & Scheduling): 
1000
Experience Hours (Cost Management): 
50

Ahmed Hisham

First Name: 
Ahmed
Last Name: 
Hisham
Professional Since: 
Sep-2014 (10.4 yrs experience)
Oldest experience: 
Jul 2012 (12.5 yrs experience, WARNING: 2.2 years variance with Professional Since)
Years Experience: 
46

Engineer - Senior Planning, Industrial and Minning Projects Authority, Industrial and Minning Projects Authority

START Date: 
July, 2012
END Date: 
December, 2014
  1. All Panning phase for the industrial projects and constract a project schedule.
  2. Monitor and control the project plan.
Experience Hours (Planning & Scheduling): 
2000
Experience Hours (Cost Management): 
2000
Experience Hours (Forensic Analysis): 
2000

Junior Engineer, Fathy Abd Rabu Construction Berau, (various projects)

START Date: 
November, 2002
END Date: 
February, 2005

I have worked on multiple building construction projects in Egypt as a junior engineer. I participated in three medium sized projects all in Alexandria

Experience Hours (Planning & Scheduling): 
1500
Experience Hours (Cost Management): 
1500

Project Risk Engineer, ENPPI, %26 Oil %26 Gas Projects

START Date: 
July, 2009
END Date: 
December, 2009

• Prepared Risk Management Methodology for the Company

• Prepared Risk Management Plan

Experience Hours (Planning & Scheduling): 
500

Civil Engineer / Planner, EGEC, WASTE WATER TREATMENT PLANT

START Date: 
July, 2008
END Date: 
July, 2010

• Developed comprehensive baseline CPM schedule.

• Updated schedules and analyzed manpower and cost allocations.

• Maintained a report of actual cost against estimated budget for all current projects at the site operations and submitted it monthly.

• Conducted CPM meetings to present information to subs and owners.

• Generated narrative reports.

• Time Impact Analysis.

Experience Hours (Planning & Scheduling): 
3500
Experience Hours (Forensic Analysis): 
500

Planning & Project Control Engineer, ARCHIRODON CONSTRUCTION (OVERSEAS), & Power infrastructure works and 132kv/66kv substation distibution station

START Date: 
July, 2010
END Date: 
April, 2011

 • Developed comprehensive baseline CPM schedule.

• Responsible for opening, updating and closing cost centers of the project.

• Allocated the resources for activities and calculate productivity of projects.

• Updated schedules and analyzed manpower and cost allocations.

• Cost Estimation.

• Maintained a report of actual cost against estimated budget for all current projects at the site operations and submitted it monthly.

• Forecasted the estimate at completion to anticipate the cost trend of the project.

Experience Hours (Planning & Scheduling): 
1500
Experience Hours (Cost Management): 
300
Experience Hours (Forensic Analysis): 
100