Kárahnjukar Hydroelectric Project, Iceland 730 M long / 193 M high concrete faced, earth-filled dam (60 Km, 7.2m dia. tunnel (locomotive / TBM track, conveyor, utilities), shafts, power intake, gate chambers, pen-stock , Face Slab, Spillway, Toe-Wall and roads (excavation > 2.8 Million m3 and fill, 8.7 Million m3, concrete 178,000 m3), (Cost > 1 Billion $)
Ghazi Barotha Hydroelectric Project, Pakistan 52 Km long 100 m wide concreted power channel along with Service Road , utilities, Approach Roads, Bridges and Super-passages (Cost > 2.25 Billion US $)