Muhammad Farhan Mallick
ENGR. MUHAMMAD FARHAN MALLICK
CURRICULUM VITAE
Nationality Pakistani
DOB 25-Dec-1981
Passport Number AD0762302
Driving License Pakistan & Qatar
Mobile +974- 66589237/+92-3332106799
Postal Address Doha, Qatar
Marital Status Married(1-Children)
Visa Status Qatar Family Visa
OBJECTIVE | To deliver, motivate and impart in accomplishing projects with maximum compliance utilizing vision, judgment and management skills acquired during 10 years of diversified experience full of strong adherence to Project’s Technical Specifications coupled with profound professional ethics along with an aim of sustainable growth and development of self and employer backed by competitively differentiating &mutually reinforcing system of capabilities. |
EDUCATION | First ClassDegree-Civil from NED University of Engineering & Technology Karachi (Pakistan) 2004 Fluent: English & Urdu |
PROFESSIONIAL AFFILIATIONS | Member Pakistan Engineering Council (Reg. # Civil/25497) Eligible for Positions of: Senior Planning Engineer
|
CERTIFIED TRAININGS & ORIENTATIONS | · Training on “Migrating from Primavera Project Planner P3 to P6” from 2-4th December 2008, delivered by CMCS. · In house training on “Effective Cost Control for Projects” by DESCONPMS. · In house training on “Effective Team Building” delivered by DESCON PMS. · In house training on “Descon Systems (Process)” delivered by DESCON PMS. · Primavera (P-3) from Institute of Engineering & Management, Karachi in 2004. · English Business Management ,Doha,2012 |
SPECIALIZED AREAS | |
AREAS | PROJECTS |
Building Construction | Residential/Commercial/High Rise /Industrial/Airport/ Cooling Plant. |
Infrastructure | Roads, Storm & Sewer Drainage System & Sub-Station. |
Oil & Gas Fields | Bosicor Oil Refinery, Pakistan & Olefin Gas Refinery, Qatar. |
PROFESSIONAL EXPERIENCE & SKILLS | · Understanding the scope of the project. · Identifying the best series of events in the correct order for the project to finish on time and on budget. · Presenting the schedule of work to others in the company and the client organization involved with the project. · Developing detailed yet simple to understand schedules and graphs. · Producing visual aids to help explain the schedule of work, including bar charts and network diagrams. · Monitoring the progress of the project at different stages of its development. · Making sure the achieved progress on the project fits the progress anticipated in the schedule. · Keeping in contact with the project manager & Contract Manager. · Making adjustments to schedules if required. · Ensuring that all the separate elements of the project fit together and are working towards a common aim. · Successfully implemented the SOP from Planning, Budgeting & Reporting functions. Submitted & got approval from client. · Assess the impact(s) of Design/Construction changes & schedule slippages. Support Contract people on variations. · Preparation of delay Claims/EOT application due to change order in line with contractual clauses & entitlements. · Prepare narrative and impacted programs using suitable delay analyzing techniques to support/substantiate the Engineer’s recommendations for Extension of Time. · Tender Schedules.Infrastructure
|
CAREER OVERVIEW |
|
| |||
COMPANY | NATURE OF PROJECT | POSITION HELD | CLIENT | DURATION |
|
MAN Enterprise, Qatar | 4-Star Hotel | Senior Planning Engineer | Holiday Inn Hotel | 2014-Present |
|
MAN Enterprise, Qatar | Oxygen Park/Infrastructure | Senior Planning Engineer | Qatar Petroleum | 2013-2014 |
|
MAN Enterprise, Qatar | Infrastructure | Senior Planning Engineer | Qatar Petroleum | 2010-2013 |
|
MAN Enterprise, Qatar | Sport Complex | Senior Planning Engineer | QOC/ASTAD | 2012-2013 |
|
MAN Enterprise, Qatar | Car Park at Intercontinental Hotel | Senior Planning Engineer | Intercontinental | 2012-2013 |
|
BEMCO Contracting Company Qatar W.L.L | New Doha International Airport | Planning Engineer | Overseas Bechtel | 2008-2010 |
|
BEMCO Contracting Company Qatar W.L.L | Cooling Chiller Plant | Planning Engineer | Dalkia | 2008-2010 |
|
Paragon Constructors (Pvt) Ltd, Pakistan | Oil Refinery | Construction Manager-Civil | Bosicor | 2007-2008 |
|
Descon Engineering Ltd. Qatar | Oil & Gas Refinery | Site Engineer/Area Planner | Technip (France) | 2006-2007 |
|
Paragon Constructors (Pvt) Ltd, Pakistan | High-rise Building/Textile Mill | Site Engineer | Dolmen/Lucky | 2004-2006 |
|
CAREER SUMMARY DETAILED PREVIEW
|
MAN Enterprise, Qatar (July, 2010 to Present)
Major responsibilities include:
· Preparation of planning and control procedures for project including detail master schedule using Primavera (P3&P6).
· Preparation of work breakdown structure (WBS) for construction activities.
· Ensure that all activities within the project are well planned, coordinated and be able to utilize all available resources.
· Resource loading of quantities and man-hour in schedule.
· Preparation of list of critical items and its close monitoring of critical activities.
· Track progress and Critical Path including preparation of Progress Reporting and Mitigation / Catch –up Plan.
· Monthly budget forecasts & financial monitoring of project using earned value analysis reports.
· Emphasize the risk related issues & coordinate with stakeholders for their action to avoid any possible delays.
· Assess the impact(s) of design/construction changes and schedule slippages. Support Contracts people on Variations (change orders).
· Preparation of delay Claims/EOT applications due to change orders in line with contractual clauses & entitlements.
· Liaise and work with multi disciplinary project personnel in work development and maintenance.
· Prepare and update monthly project reports, verify progress report and attending site meeting.
· Ensure that all works carried out in accordance with approved schedule and requirements.
· Tendering Schedule.
Currently working on the following Projects:
June 2014 to Present Holiday Inn Hotel (4 Star)
Designation: Senior Planning Engineer
Client / Engineer: Holiday Inn Hotel.
Location: Doha, Qatar
May 2013 to June 2014 Oxygen Park at Education City
Designation: Senior Planning Engineer
Client / Engineer: Qatar Petroleum.
Location: Doha, Qatar
July 2010 to October 2013 North Infrastructure Site Wide (NSIP) Qatar Foundation
Designation: Senior Planning Engineer
Client / Engineer: Qatar Petroleum.
Location: Doha, Qatar
August 2012 to January 2013Construction of Multi Purpose Hall at Al Sadd Sports Club
Designation: Senior Planning Engineer
Client / Engineer: Qatar Olympic Committee.
Location: Doha, Qatar
June 2012 to January 2013 Car Park at Intercontinental Hotel
Designation: Senior Planning Engineer
Client / Engineer: Intercontinental Hotel.
Location: Doha, Qatar
BEMCO Contracting Company Qatar W.L.L (August 2008 to July 2010)
Major responsibilities include:
· Preparation of master schedule on level III/IV for construction activities of projects schedule using Primavera (P3 & P6).
· Preparation of work breakdown structure (WBS) for construction activities.
· Resource loading of quantities and man-hour in schedule.
· Monitoring and reporting of weekly & monthly progress of project with narrative report, progress s-curve and manpower histogram.
· Preparation of list of critical items and its close monitoring of critical activities.
· Preparation of quarterly project review report for observation & comments.
· Preparation of 1 month/3 months forecast/look-ahead schedule.
· Generation of weekly and monthly targets from Primavera for construction team.
· Management of daily man-hour & manpower record as per WBS.
Worked on the following Projects:
April 2010 to July 2010 New Doha International Airport Project (NDIA)
Utilities Package-13
Designation: Planning Engineer
Client / Engineer: NDIA / Overseas Bechtel Inc.
Location: Doha, Qatar
Project Value: QAR 2.6 Billions
Aug, 2008 to Apr, 2010 Bahrain Bay Development Project, Bahrain
Designation: Planning Engineer
Client / Engineer: BBU/Dalkia
Location: Bahrain
Project Value: BD 136 Million
Paragon Constructors (PVT) Ltd, Pakistan (Oct 2007 to August 2008)
Major responsibilities include:
· Schedule the project in logical steps and budget time required to meet deadlines.
· Ensure that all civil activities within the designed areas are well planned, coordinated and be able to utilize all available resources in coordination with other functional Manager in directing and supervising all involved site personnel & subcontractors.
· Prepare contracts and negotiate revisions, changes and additions to contractual agreements with architects, consultants, clients, suppliers and subcontractors.
· Study job specifications to determine appropriate construction methods.
· Requisition supplies and materials to complete construction projects.
· Prepare and submit budget estimates and progress and cost tracking reports.
· Develop and implement quality control programs.
· Take actions to deal with the results of delays, bad weather, or emergencies at construction site.
· Confer with supervisory personnel, owners, contractors, and design professionals to discuss and resolve matters such as work procedures, complaints, and construction problems.
· Plan, organize, and direct activities concerned with the construction and maintenance of structures, facilities, and systems.
· Investigate damage, accidents, or delays at construction sites, to ensure that proper procedures are being carried out.
· Evaluate construction methods and determine cost-effectiveness of plans, using latest computer software (Primavera).
· Developing the programmed of work and strategy for making the project happen.
· Complies with the highest level of health, safety and zero accident during all stages of project execution and pro-active with safety groups & subcontractors to promote safe and hazardous free work within the designated area.
· Using construction management software packages to plan smooth work flows.
· Communicating with a range of people including the client, subcontractors, suppliers, the public and the workforce.
Worked on the following Project:
Oct 2007 to Aug 2008 Bosicor Oil Refinery, Pakistan
Designation: Construction Manager Civil
Client: Bosicor (PVT) Ltd, Pakistan
Location: Karachi, Pakistan
Project Value: Pak 400 Millions
Descon Engineering Ltd. Qatar (April 2006 to October 2007)
Major responsibilities include:
· Watch and inspect the construction work and assure that it is done in full accordance with the drawings, technical specifications and bills of quantities.
· Estimates, prepares and assigns the resources such as manpower, materials, consumables, equipment, tools, etc., required for all civil works prior to execution.
· Supervising the works on site in accordance with the contract documents and using the template and procedure established by the consultant.
· Inspecting and testing materials prior to their use at site as per sample approved by the consultant and ensuring removal of rejected material out from site.
· Ensuring the correct implementation of the works according to technical specifications, to designs and quality of materials.
· Preparing list of tests that may be required and following these tests to be carried out at site. Keeping a log of all test conducted at site.
· Checking and testing of completed works, taking photos on a regular basis and also on account of defective work.
· Checking and ensuring that the site is arranged as per the site management plan and that all measures are taken for site safety and the safety of the third parties in the vicinity of the site
· Prepare weekly report and suggest and instruct additional safety measures if needed.
· Update of work plan of the contracts – monthly.
· Preparation of list of critical items and its close monitoring.
Worked on the following Project:
Apr 2006 to Oct 2007 Ras Laffan Olefin Project
Designation: Area Planner & Site Engineer
Client: Technip (France).
Location: Ras Laffan Industrial City, North Coast, Qatar
Project Value: QAR 3.2 Billions
Paragon Constructors (Pvt) Ltd, Pakistan (Dec 2004 to April 2006)
Major responsibilities include:
· Estimates, prepares and assigns the resources such as manpower, materials, consumables, equipment, tools, etc., required for all civil works prior to execution.
· Assign targets for accomplishments and ensure targets are met on daily basis for all civil groups at site.
· Monitors the actual physical works at site.
· Setting out, leveling and surveying the site.
· Submits site daily reports, inspection requests, estimates and all applicable monitoring reports on regular basis or as required.
· Directly responsible for the safety of all civil groups’ personnel of the project by ensuring that the project execution will be done according to all applicable health, safety, sanitary and environmental standards.
· Prepare weekly and Monthly Reports.
Worked on the following Projects:
Dec 2005 to Apr 2006 Dolmen City (High Rise Building), Karachi, Pakistan
Designation: Site Engineer
Client: Dolmen Builders, Pakistan
Project Value: Pak 4.3 Billions
Dec 2004 to Dec 2005 Lucky Textile Mills # 4, Karachi, Pakistan
Designation: Management Trainee & Site Engineer
Client: Lucky Textile, Pakistan
Project Value: Pak 600 Millions
- Industry: