PROJECT ENGINEER, BST Services, Chachar Gas Plant Relocation Project, and so on,
JOB RESPONSIBILITIES
o HAZOP Scriber for HAZOP Study under the supervision of HAZOP Chairman & developed HAZOP detailed Report
o Project Scheduling in Primavera P6 & MS Project 2010
o Controlling & Monitoring Project Schedule and Resource Loading & S-Curves
o Tender’s Evaluation & Develop required technical Documents at the initial stage
o Established Procedures of Dismantling, Installation, Pre-Commissioning, Commissioning, Transportation, Rigging etc.
o Equipment Technical Evaluation & P&IDs, PFDs Evaluation
o New Equipment PO preparation e.g. HCDP unit, Condensate Stabilization unit etc.
o Prepared Pre-qualification Documents for OMV
PROJECTS CONTRIBUTED
· Dismantling, Relocation & Installation of Chachar Plant to Shahdad Wellsite, Supply and Installation of additional process & Utility Equipment and Allied Services for Setting up Shahdad Gas Processing Facility of PPL.
· Construction/Welding and installation of “8 inch dia buried and aboveground pipeline” from Kinza Well X-1 to Sharaf Plant.- Pakistan Petroleum Limited
· Construction/Welding and installation of “16 inch dia buried and aboveground Sales Gas pipeline” from Sharaf Plant to SSGCL S3- Pakistan Petroleum Limited
· Maintenance of “Cathodic Protection” system at Kandhkot Gas field-Pakistan Petroleum Limited
· Construction/Welding and installation of 4inchdia buried and aboveground pipeline. Flow line from Chachar gas field to Kandhkot field - Pakistan Petroleum Limited.
· Replacement of bottom plates of Condensate storage tanks at Adhi Gas Field-Pakistan Petroleum Limited.
· Drilling Site preparationand executed Conductor Casing run to 41 m depth using drilling machine at Falah X-1 Shahdad-pur Gambat block.
- Company:
- Industry:
- Job Role:
- Project:
- Region: