PROJECT ENGINEER, BST Services, Chachar Gas Plant Relocation Project, and so on,

START Date: 
April, 2013
END Date: 
November, 2014

JOB RESPONSIBILITIES

 

o   HAZOP Scriber for HAZOP Study under the supervision of HAZOP Chairman & developed HAZOP detailed Report

o   Project Scheduling in Primavera P6 & MS Project 2010

o   Controlling & Monitoring Project Schedule and Resource Loading & S-Curves

o   Tender’s Evaluation & Develop required technical Documents at the initial stage

o   Established Procedures of Dismantling, Installation, Pre-Commissioning, Commissioning, Transportation, Rigging etc.

o   Equipment Technical Evaluation & P&IDs, PFDs Evaluation

o   New Equipment PO preparation e.g. HCDP unit, Condensate Stabilization unit etc.

o   Prepared Pre-qualification Documents for OMV

 

PROJECTS CONTRIBUTED

·         Dismantling, Relocation & Installation of Chachar Plant to Shahdad Wellsite, Supply and Installation of additional process & Utility Equipment and Allied Services for Setting up Shahdad Gas Processing Facility of PPL.

·      Construction/Welding and installation of “8 inch dia buried and aboveground pipeline” from Kinza Well X-1 to Sharaf Plant.- Pakistan Petroleum Limited

·      Construction/Welding and installation of “16 inch dia buried and aboveground Sales Gas pipeline” from Sharaf Plant to SSGCL S3- Pakistan Petroleum Limited

·      Maintenance of “Cathodic Protection” system at Kandhkot    Gas field-Pakistan Petroleum Limited

·      Construction/Welding and installation of 4inchdia buried and aboveground pipeline. Flow line from Chachar gas field to Kandhkot field - Pakistan Petroleum Limited.

·         Replacement of bottom plates of Condensate storage tanks at Adhi Gas Field-Pakistan Petroleum Limited.

·         Drilling Site preparationand executed Conductor Casing run to 41 m depth using drilling machine at Falah X-1 Shahdad-pur Gambat block.

Experience Hours (Planning & Scheduling): 
3500
Experience Hours (Cost Management): 
450
Experience Hours (Forensic Analysis): 
300