WBS description into Activity Description- Global change

4 replies [Last post]
Rajkamal Tangirala
User offline. Last seen 34 weeks 5 days ago. Offline
Joined: 29 Mar 2010
Posts: 9

Hi,

I am generating a engineering schedule. Our Client has asked to present schedule that it lists the control gates under each WBS.

I have listed the Deliverables at WBS level and would like to have the WBS name concatnated with the Activity Description.

For EX. P&IDs -- WBS Level

            P&IDs - IFR - Activity Level

            P&IDs - Receive Comments - Activity Level  so on for other control gate

the reason behind is without the description makes it difficult for sequencing.

Can some one guide me how this can acheived if possible.

Thanks in Advance,

Rajkamal

 

Replies

Rajkamal Tangirala
User offline. Last seen 34 weeks 5 days ago. Offline
Joined: 29 Mar 2010
Posts: 9

Select Global change under Tools

 1. Create a New Global change

 2. Open the New Global Change

 3. Under the Select Subject Area to the left select "Äctivities

4. Under the first Option box set Paramater to "Any of the Following"

5. "Where" set Paramater to " Activity Name" " Starts with" " IFA/IFR/IFI"- the operator "OR" should be used for different Lines this shall be as per the line in the p6

6. Then in the output condition box the parameters as " Activity Name"  "=" Paramter Value "WBS Name"" operater "&" Äcivity Name".

7436
activity_name_change.png

 

Zoltan Palffy
User offline. Last seen 8 hours 43 min ago. Offline
Joined: 13 Jul 2009
Posts: 3091
Groups: None

where is the text of the changes ?

Rajkamal Tangirala
User offline. Last seen 34 weeks 5 days ago. Offline
Joined: 29 Mar 2010
Posts: 9

sure Sir Mr Zoltan

thist is what i had in my schedule

Then navigate to menu -> Tools-> Global Change-> modified as -> below

commit changes below is outcome

i require a hyphen that i inserted using the find and replace.

Thanks.

Zoltan Palffy
User offline. Last seen 8 hours 43 min ago. Offline
Joined: 13 Jul 2009
Posts: 3091
Groups: None

ok can you tell us  ?

Rajkamal Tangirala
User offline. Last seen 34 weeks 5 days ago. Offline
Joined: 29 Mar 2010
Posts: 9

Thanks guys i found it i understood want i was doing wrong.