Website Upgrade Incoming - we're working on a new look (and speed!) standby while we finalise the project

Primavera P6

Planning Engineer & Site Engineer, Arabtec Construction LLC, College of Arts and Education - Kuwait University

START Date: 
December, 2012

 

1.      Supervising and superintending the day to day site activities to deliver production to the maximum rate with the required satisfying level of quality according to the project specs.

2.      Coordinating the materials (Formworks) recycle plan within the site to put them at the maximum level of efficiency

Planner/Scheduler, Mohammad Al-Barghash Trading & Contracting Company, Installation of Gas Pipeline and Scraper Facility

START Date: 
May, 2010

Reponsible in Preparing detailed baseline schedule based on the project requirements.

Plans, review and make thorough study of the project and define its requirements.

Collaborate with the Quantity surveyor to obtain the detailed quantities of the specific project.

Prepares execution plan on how to do the project required by the client and define whats the resources

are needed for each scope of work. And see to it that resources  are sufficient enough to complete the job.

And make sure that material availability will conform with project requirement.

Project Planner, Calibre Global, T155 Rail Expansion

START Date: 
August, 2012

EPCM Site Planner in the heavy haul sector of the rail industry, in Pilbara region of Western Australia.

Planning Engineer, ConocoPhillips Indonesia, Letang Tengah Rawa Optimization Project

START Date: 
September, 2011

As Planning Engineer with responsibility :
- Update Primavera P6 Schedule and Risk Register
- Review Contractor schedule, progress and report
- Provide overall planning, scheduling and progress reporting structure for Projects Management Team
- Liaise and coordinate planning information
- Provide planning and scheduling support during the development of bid documents and evaluations
- Advice to Project Management Team regarding all aspects of Planning, scheduling and progress reporting

Team Leader - Project Planning & Scheduling, AMEC Americas, FFT-CFSP Project

START Date: 
December, 2011

 

FFT-CFSP ProjectThe project involved cleaning of Lake Mildred in Fort McMurray and separation of matur/fluid fine tailings from the water and dumping on designated areas. It involved design and procurement of new onshore and offshore facilities involving centrifuge buildings, polymer, gpsum and screening facilities, dredgers, barges and floating pipelines along with ice breaking systems and also included take away and loading conveyors for trucking to designated areas as per regulations of the Canadian Government.

Senior Quantity Surveyor/Contract Administrator, RG Lagman and associates/NGB Construction/Cebarco-WCT Eng'g Berhad/Dhafir Dev't & Contracting/Faithful+Gould/GPD Investments LLC/Technologists Inc./AECOM, Civil (roads and bridges), formula 1 racing circuit

START Date: 
October, 1996
Quantity Surveying & Cost management: •Cost Estimation & Cost control, Contract Management, Procurement Coordination; •Prepare BOQ recapitulation; •Prepare Monthly Financial Affairs Report; •Prepare and Maintain Interim and Final Quantity Books; •Check the Contractor’s interim and final pay certificates; •Evaluate unit rates for new items of works; •Check joint measurements for interim payments; •Compute final pay quantities; •Maintain current as-built drawings as the work progresses; •Maintain progress schedule and cash flow chart; •Assist in preparation of Variation Orders. 
Experience Hours (Planning & Scheduling): 
5750
Experience Hours (Cost Management): 
28800

Planner, Alstom GRID, Rio Madeira HVDC

START Date: 
July, 2010
END Date: 
May, 2011

Providing planning and process development support for two major infrastructure projects (HVDC power transfer) within a new engineering PMO structure.

Assisted in the transition from MS Project to Primavera as the planning tool of choice.

Contractor position, initially for Areva T&D and then for Alstom GRID following a takeover.

Planning & Project Controls Manager, Parsons Brinckerhoff Ltd, Electricity Transmission Major Works

START Date: 
May, 2007
  • Providing a National Grid joint venture with programme management, planning & project control capability for the entire Northern Substation Alliance workbook.

Senior/Junior Projects Planning, Cost Control & DB, Petrobel (EGPC/ENI/BP), Oil and Gas On/Offshore development program of various sized projects

START Date: 
November, 2001
END Date: 
December, 2008

 

Senior/Junior Projects Planning, Cost Control & DB

Petrobel Egypt (Oil & Gas Client/ENI & BP)

 

  • From February, 1st 2003 to December, 31st 2008 - Cairo Head Office

Ä  Support Project Development Team identifying and planning project activities.

Ä  Prepare and keep updated the overall projects master schedules and budgets.

Market Place

No results found... (try selecting a different content filter)

Syndicate content