Project Planner, Italferr S.p.A., Urban railway junction of Florence (High speed railway project)

START Date: 
November, 2002
END Date: 
August, 2003

Scope of work:

High speed railway Project Milan-Naples: Urban railway junction of Florence (job: A123). Placing all tracks crossing the city underground, plus the construction of a new underground station for high-speed lines under the existing Central Station area, the construction of a tram system, the commissioning of four new stops, and the connecting up to the new high-speed line Bologna-Rome.

Senior Planner, SNAMPROGETTI – Milano, Combined Cycle Power Plant, Fertilizer complex, Refinery upgrade

START Date: 
April, 2005
END Date: 
November, 2007

Main Projects:

  • ENGRO New Ammonia – Urea Plant:

TKLS Project for the construction of a fertilizer complex consisting in two plants: the first one for the production of 2,194 MTPD of Ammonia using the technology licensed by Harold Topsoe A/S and the second one for the production of 3,835 MTPD of prilled Urea using Snamprogetti S.p.A technology.

Senior Planner, Tecnimont, New Propane Dehydrogenation (PDH) Plant

START Date: 
December, 2009

Scope of work:

To build a Propane Dehydrogenation (PDH) Unit with design production capacity of 510.000 MTPY of propylene based on the UOP “Oleflex” Propane Dehydrogenation technology. The scope of works consists in Detail Design, Engineering, Construction and Pre-commissioning services activities.

Lead Planning & Project Control Engineer, Hitachi Power Europe GmbH, Coal Fired Power Plant Convoy (Rotterdam)

START Date: 
March, 2009
EPC - Contract Develop the basline program Maintenance the schedule Critical Path Analyse Time Impact Analyse

Planning Engineer, Qatar Building Company, Infrastructure projects

START Date: 
August, 2010
•Selecting the appropriate techniques and sequence of work. •Create and maintain Construction Schedule. •Monitoring progress throughout the construction process and comparing this with the projected schedule of work. •Plan and oversee the programme of work and anticipate a contract's demands in terms of labours, materials, equipment and technical challenges. •Prepares progress reports and other highlights of the projects. •Prepares resource loading, s-curve planned / forecast cost

Planning & Control Engineer, DC U.A.E., INFRA & BUILDING PROJECTS

START Date: 
March, 2007
END Date: 
July, 2010

·         Provide a full planning, work management and analysis of construction activities (P6).

·         Prepares cash flow & Program of construction with scheduled resource (P6).

·         Prepare WBS for the Project.

·         Prepares monthly report & monthly payment certificate.

Trainee Engineer, Trinidad Cement Limited, Kiln 4 Installation Project

START Date: 
August, 1994
END Date: 
September, 1995
  • Installation QA/QC for Electrostatic Precipitator (ESP) Installation.
  • Prepared specifications for purchase of various equipment types.
  • Prepared project financial and schedule updates for presentation at up to Board Level.

Planning Manager, Midmac - Six construct - (Besix) Joint Venture, Extension to Qatar Convention Center

START Date: 
October, 2009
END Date: 
April, 2010

 - A Planning Manager for the Midmac-Sixco Joint Venture of the Extension to Qatar National Convention Center  project, managing a team of three planning engineers and one senior planner. The project consists of civil works, complex MEP, cutting edge finishes, in addition to external infrastructural works & landscaping, with Qatar Foundation (QF) as the owner represented by Qatar Petroleum (QP) as Client representative and KEO as the consultant.

Engineering Planner / Scheduler, Saudi Oger Ltd., Princess Noura University Riyadh, Private Villas & Palaces

START Date: 
May, 2010
END Date: 
January, 2012

Prepared Contract Programme for incoming projects as per tender documents. Assisted Planning Supervisor  in the monitoring and updating of on-going site progress, resource utilization, and cash flow. Review and evaluates monthly and weekly progress reports of on-going projects submitted by the Site Planner. Monitors and updates all the subcontractor’s construction programme, resource histogram, shop drawing submission and material procurement schedule as submitted by Resident/ Site Planner.

Planning Engineer, Engineering Consultants Group (ECG), AL-Waab City

START Date: 
January, 2009
END Date: 
July, 2010

 

  • Prepares progress reports and other highlights of the projects.
    •  Review contractors’ schedules and manpower loading.
    • Review earned value analysis report.
    •  Review and check construction plans.
    •  Develop manning schedule and manpower for project under ECG head office.
    •  Develop design’s programmes for design projects with PWA and Kahrama.
    •  Prepare proposal and preliminary schedule for tender.