All associated with project cost engineering

Mechanical Project Engineer, ETA Engineering Pvt Ltd, Delhi Metro Project

START Date: 
April, 2009
END Date: 
September, 2010
  • Estimation and costing for MEP activity and preparation of proposal by clearly studying the tender document like specification, Drawing and tender conditions.
  • Preparation of Job Cost analysis and controlling the cost during the procurement of material.
  • Identifying the extra item and submitting the variation proposal for the approval.
  • Preparation of monthly bill and measurement sheet as backup document.
  • Preparation of MEP baseline program and procurement of material as per the project schedule.
  • Calculation of Pump Head,