Developed integrated level IV baseline schedules for assigned project based on execution philosophy, scope of work, contractual obligations and stakeholder’s requirements.
Created progress measurement system aligned with the project work breakdown structure (WBS) and contract specifications based on project complexity.
Posted Sun, 2013-09-08 19:27 by vidyadhar bhojaraj
START Date:
April, 2009
END Date:
September, 2010
Estimation and costing for MEP activity and preparation of proposal by clearly studying the tender document like specification, Drawing and tender conditions.
Preparation of Job Cost analysis and controlling the cost during the procurement of material.
Identifying the extra item and submitting the variation proposal for the approval.
Preparation of monthly bill and measurement sheet as backup document.
Preparation of MEP baseline program and procurement of material as per the project schedule.