Progress Reporting

Senior Planning & Cost Control Engineer, Consultant, Refinery

START Date: 
June, 1980

Developing Project Schedule, Risk Analysis, Resourcing, Creating Earned Value Management systems, Claims and Analysis of schedule, Time Analysis, Variations & Claims Analysis.Etc

The Industries Worked in:

!. Petro-Chem - Refinary / Offshore  Platforms

2, Power Generation & Transmission

3. Water - Treatment & Desalination

4. Railway

5. Infra-Structure

6. Pharmaceuticals

Project Manager, Buro Four Project Services, 29 30 St James Street

START Date: 
June, 2013

Current role : Project Manager

Current Jobs :

£16m mixed use development for The Crown Estate with commercial offices, two retail units and five luxury apartments. A re-build within two retained facades.

£4.5m Main services overhaul, toilet and reception refurbishment within an ocupied office - Central London

Fast Track confidential office  fit out in Central London

Sr. Cost & Scheduling Consultant, Ansaldo Energia, (various projects)

START Date: 
June, 1974

Please, I would like to introduce myself at your kind attention.

I’m Corrado Austeni Italian nationality with residence in Venice.

I have 20 years worldwide experience on EPC contracts (Client and Contractor side) as Sr. Planning Eng. and Cost Control.

Extensive use of planning tools as Primavera P6, using Earned Value Method to organize and monitoring Engineering, Procurement,

Site Construction and Commissioning progress Percentage plus “S” curves charts,

And Men-Power Histograms for projects on the field of:

 

Sr. Cost & Scheduling Consultant, Ansaldo Energia, (various projects)

START Date: 
June, 1974

Please, I would like to introduce myself at your kind attention.

I’m Corrado Austeni Italian nationality with residence in Venice.

I have 20 years worldwide experience on EPC contracts (Client and Contractor side) as Sr. Planning Eng. and Cost Control.

Extensive use of planning tools as Primavera P6, using Earned Value Method to organize and monitoring Engineering, Procurement,

Site Construction and Commissioning progress Percentage plus “S” curves charts,

And Men-Power Histograms for projects on the field of:

 

CONSTRUCTION MANAGER, Space Ace Pvt. Ltd., 5* Hotel Project

START Date: 
November, 2004

ØDischarge of duties for monitoring of projects in line with training manual

 

ØMonitoring day-to-day site activities and guiding all Project Engineers

 

ØOrganising PRM AND DRM, and circulating the Agenda and MOMs

 

ØOverall incharge of construction process monitoring

 

ØMonitoring all intended tests at Laboratory and witnessing the same.

 

Scheduler, eDRAGON Power Builder, 37-Storey Residential Building

START Date: 
February, 2013
  1. Monitors project status & plan for catch-up as necessary.
  2. Analyzes related factors that causes delays & be able to scrutinize the delays to control probable slippage of schedule and or minimize its effect in the overall execution of the project.
  3. Tracks down and assess weekly progress.
  4. Prepares weekly and monthly accomplishment reports.
  5. Revision of project schedule.
  6. Prepares look ahead schedule.
  7. Prepares Manpower report.
  8. Attend management meeting as to present project status.

Senior Planning Engineer, Khatib and Alami (CEC), Al Osaimi Apartments and Beach Resort, Dar Wasl Residential Development, Double Tree Hotel by Hilton at Bay Square, Remraam Housing Community Phase 2A

START Date: 
May, 2013
END Date: 
July, 2018

As Senior Project Controls Engineer, I was involved with K&A’s Business Operations (Gulf) – Projects Control department since May 2016 till July 2018 where I was responsible for;

 

Experience Hours (Planning & Scheduling): 
5600
Experience Hours (Cost Management): 
4000
Experience Hours (Forensic Analysis): 
7200

Senior Planner, Mott MacDonald Bentley, YW AMP5 Projects

START Date: 
June, 2010

I am currently the senior planner for Mott Macdonald Bentley working on all AMP5 schemes for Yorkshire water based in the Leeds office.  I also prepare tender submission programmes and have worked on multiple schemes for Severn Trent.  Prior to becoming a planner I have 10years of site experience from being an engineer through to site agent.  I have also gained commercial experience from being part of the estimating team.

I am an active member of the MMB BIM working group and have experience using a number of 4D planning software packages.

Experience Hours (Planning & Scheduling): 
6500

Senior/Lead Planner, Mercon Steel Structures in Gorinchem Netherlands, Various Oil & Gas offshore and EPC heavy structural steel projects

START Date: 
January, 2013
END Date: 
June, 2014
For Tenders:Made Tender schedules for steel constructions in the broadest sense andmultidisciplinary projects such as offshore production facilities in Primavera P6. Setup, developed and realised the fully integrated EPC tender planning for the renovationof 8 bridges over the Amsterdam-Rhine Canal. This was the combinationKWS-Mercon for Kargo Project. Organised and integrated the subcontractorsschedules for the overall EPC Tender planning process.

Project Control Manager, Cosapi S.A., Sewage Treatment Plant

START Date: 
October, 2011
END Date: 
June, 2012

 

- Setting and Monitoring Schedules and Cost Baselines

- Reforecast Budget at Completion

- Preparation of Cash Flow

- Elaboration of Reports to the Client and the Steering Committee

Other Duties

Experience Hours (Cost Management): 
1500